Livingston South
LVGScotlandManaged by ScotRail
How this station is performing
Livingston South had 19,853 scheduled stops to Period 7 of 2026-27, about 54 a day. 90.8% of recorded arrivals were within three minutes of the timetable and 1.3% of scheduled stops were cancelled.
Livingston South opened on 6 October 1984, 42 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Livingston South is the newest; the oldest, Kirknewton, opened in 1848.
The nearest stations to Livingston South are Livingston North (4.2 km north-west), West Calder (4.5 km south-west), Kirknewton (4.7 km north-east), Uphall (5.3 km north) and Addiewell (7.3 km south-west). 6 stations lie within 10 km in all. Of the five, West Calder is the most punctual at 91.4% and Kirknewton the least at 83.5%, with Livingston South on 90.8%.
Livingston South is named after Livingston, a town, home to about 57,030 people, but the station stands 1.6 km from its centre.
Across the whole run of data, the weakest four-week period for Livingston South was Period 8 of 2024-25, at 84.3%, some time before the latest year. The strongest was Period 13 of 2024-25, at 94.6%, and the two are 10.3 percentage points apart. Cancellations peaked at 6.8% of scheduled stops in Period 10 of 2024-25, against 1.3% over the latest 13 periods.
Compared with 3 stations of a similar size in Scotland, Livingston South is the least punctual, at 90.8%. All of them are ahead, including West Calder (91.4%), Inverkip (97.4%) and Wemyss Bay (96.6%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| ScotRail | 19,853 | 90.8% | 1.3% |
Operators with their own page for this station are linked to it.
Late train at Livingston South? Delay Repay
These operators call at Livingston South and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,580 | 87.6% | 1.5% |
| Period 6 of 2026-27 | 1,581 | 91.5% | 0.4% |
| Period 5 of 2026-27 | 1,581 | 91.2% | 0.4% |
| Period 4 of 2026-27 | 1,517 | 91.5% | 2.5% |
| Period 3 of 2026-27 | 1,580 | 92.5% | 1.5% |
| Period 2 of 2026-27 | 1,532 | 91.4% | 0.9% |
| Period 1 of 2026-27 | 1,778 | 93.1% | 1.9% |
| Period 13 of 2025-26 | 1,126 | 92.0% | 0.6% |
| Period 12 of 2025-26 | 1,560 | 92.4% | 1.4% |
| Period 11 of 2025-26 | 1,560 | 91.8% | 1.3% |
| Period 10 of 2025-26 | 1,337 | 90.5% | 1.6% |
| Period 9 of 2025-26 | 1,561 | 86.4% | 1.8% |
| Period 8 of 2025-26 | 1,560 | 88.1% | 0.5% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Scotland
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| West Calder | 19,853 | 91.4% | 1.3% |
| Inverkip | 20,030 | 97.4% | 1.8% |
| Wemyss Bay | 20,030 | 96.6% | 1.8% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out