Warrington Bank Quay
WBQNorth WestManaged by Avanti West Coast
How this station is performing
Warrington Bank Quay had 45,021 scheduled stops to Period 7 of 2026-27, about 124 a day. 59.1% of recorded arrivals were within three minutes of the timetable and 3.3% of scheduled stops were cancelled.
Warrington Bank Quay opened on 3 June 1832. It was moved to the site it uses now on 16 November 1868. Of the 5 stations nearest to it with a known opening date, Warrington Bank Quay is the oldest; the next oldest, Warrington Central, dates from 1873.
The nearest stations to Warrington Bank Quay are Warrington Central (1.0 km north-east), Warrington West (2.4 km west), Sankey For Penketh (3.3 km west), Padgate (3.8 km north-east) and Birchwood (6.0 km north-east). 11 stations lie within 10 km in all. At 59.1%, Warrington Bank Quay is less punctual than all of them; the best of the five, Sankey For Penketh, manages 75.4%.
Warrington Bank Quay is named after Warrington, a big city, home to about 165,456 people, but the station stands 0.2 km from its centre.
4 operators call at Warrington Bank Quay: Avanti (45.4%, 49% of stops), Transport for Wales (74.4%, 28% of stops), Northern (69.4%, 22% of stops) and Caledonian Sleeper (–, 0% of stops). The operator you travel with matters: Transport for Wales reaches 74.4% within three minutes while Avanti manages 45.4%, a gap of 29.0 percentage points.
Compared with 3 stations of a similar size in North West, Warrington Bank Quay is the least punctual, at 59.1%. All of them are ahead, including Macclesfield (61.5%), Edge Hill (81.0%) and St Michaels (95.6%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Avanti | 22,227 | 45.4% | 3.9% |
| Transport for Wales | 12,784 | 74.4% | 1.2% |
| Northern | 10,009 | 69.4% | 4.9% |
| Caledonian Sleeper | 1 | – | – |
Operators with their own page for this station are linked to it.
Late train at Warrington Bank Quay? Delay Repay
These operators call at Warrington Bank Quay and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 3,483 | 56.2% | 2.3% |
| Period 6 of 2026-27 | 3,481 | 51.8% | 1.6% |
| Period 5 of 2026-27 | 3,338 | 53.4% | 4.7% |
| Period 4 of 2026-27 | 3,324 | 51.6% | 5.0% |
| Period 3 of 2026-27 | 3,352 | 54.6% | 3.2% |
| Period 2 of 2026-27 | 3,317 | 60.3% | 3.5% |
| Period 1 of 2026-27 | 3,956 | 67.4% | 1.3% |
| Period 13 of 2025-26 | 3,794 | 68.5% | 3.0% |
| Period 12 of 2025-26 | 3,508 | 66.6% | 2.3% |
| Period 11 of 2025-26 | 3,427 | 66.9% | 3.2% |
| Period 10 of 2025-26 | 2,987 | 62.4% | 3.9% |
| Period 9 of 2025-26 | 3,517 | 47.5% | 6.4% |
| Period 8 of 2025-26 | 3,537 | 58.2% | 3.3% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in North West
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Macclesfield | 44,898 | 61.5% | 5.1% |
| Edge Hill | 45,720 | 81.0% | 3.1% |
| St Michaels | 43,223 | 95.6% | 1.9% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out