Macclesfield
MACNorth WestManaged by Avanti West Coast
How this station is performing
Macclesfield had 44,898 scheduled stops to Period 7 of 2026-27, about 123 a day. 61.5% of recorded arrivals were within three minutes of the timetable and 5.1% of scheduled stops were cancelled.
Macclesfield opened on 2 August 1869. It was moved to the site it uses now on 1 July 1873. Of the 5 stations nearest to it with a known opening date, Macclesfield is the newest; the oldest, Alderley Edge, opened in 1842.
The nearest stations to Macclesfield are Prestbury (4.1 km north-west), Adlington (Cheshire) (6.7 km north), Alderley Edge (9.1 km north-west), Poynton (10.2 km north) and Wilmslow (10.3 km north-west). 3 stations lie within 10 km in all. At 61.5%, Macclesfield is less punctual than all of them; the best of the five, Poynton, manages 81.8%.
Macclesfield takes its name from a market town called Macclesfield, home to about 56,581 people, and the station stands 0.4 km from its centre.
3 operators call at Macclesfield: CrossCountry (57.8%, 45% of stops), Avanti (49.6%, 28% of stops) and Northern (79.4%, 27% of stops). The operator you travel with matters: Northern reaches 79.4% within three minutes while Avanti manages 49.6%, a gap of 29.8 percentage points.
2 of 3 stations of a similar size in North West are more punctual than Macclesfield on 61.5%. The comparison group includes Warrington Bank Quay (59.1%), Edge Hill (81.0%) and St Michaels (95.6%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| CrossCountry | 20,060 | 57.8% | 6.8% |
| Avanti | 12,720 | 49.6% | 5.2% |
| Northern | 12,118 | 79.4% | 2.2% |
Operators with their own page for this station are linked to it.
Late train at Macclesfield? Delay Repay
These operators call at Macclesfield and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 3,427 | 60.5% | 3.9% |
| Period 6 of 2026-27 | 3,403 | 57.8% | 3.8% |
| Period 5 of 2026-27 | 3,349 | 57.6% | 5.4% |
| Period 4 of 2026-27 | 3,420 | 53.4% | 6.3% |
| Period 3 of 2026-27 | 3,407 | 59.7% | 4.0% |
| Period 2 of 2026-27 | 3,390 | 61.2% | 4.5% |
| Period 1 of 2026-27 | 3,936 | 66.2% | 5.2% |
| Period 13 of 2025-26 | 3,793 | 69.9% | 7.0% |
| Period 12 of 2025-26 | 3,426 | 68.6% | 3.9% |
| Period 11 of 2025-26 | 3,426 | 68.2% | 5.7% |
| Period 10 of 2025-26 | 3,070 | 64.3% | 5.4% |
| Period 9 of 2025-26 | 3,447 | 51.4% | 8.1% |
| Period 8 of 2025-26 | 3,404 | 59.1% | 2.8% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in North West
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Warrington Bank Quay | 45,021 | 59.1% | 3.3% |
| Edge Hill | 45,720 | 81.0% | 3.1% |
| St Michaels | 43,223 | 95.6% | 1.9% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out