Avanti at Warrington Bank Quay
All trains at Warrington Bank QuayAvanti across BritainNorth West
How this operator is doing here
Avanti had 22,227 scheduled stops at Warrington Bank Quay in the 13 periods to Period 7 of 2026-27, 49% of the station's total. 45.4% of recorded arrivals came within three minutes and 3.9% of stops were cancelled.
Avanti trains at Warrington Bank Quay also serve Runcorn (10.4 km south-west, 67.9% on time, 6.0% cancelled), Rainhill (11.4 km west, – on time, – cancelled), Hartford (Cheshire) (16.4 km south, – on time, – cancelled), Wigan North Western (17.6 km north, 46.5% on time, 3.9% cancelled), Liverpool South Parkway (19.3 km west, 66.0% on time, 6.9% cancelled) and Liverpool Lime Street (24.9 km west, 64.9% on time, 5.8% cancelled), which are the stations on its network closest to Warrington Bank Quay.
Within 30 km of here, Avanti runs best at Runcorn, 10.4 km south-west (67.9%), and worst at Wigan North Western, 17.6 km north (46.5%).
The busiest Avanti station within 30 km of Warrington Bank Quay is Stockport, 29.3 km east, with about 87 scheduled stops a day.
Avanti at Warrington Bank Quay has slipped sharply. 45.4% of stops came within three minutes of the timetable in the latest 13 periods, 6.1 percentage points worse than the 51.5% recorded in the 13 before. Cancellations rose to 3.9% of scheduled stops from 2.9%, which is 1.0 percentage points more.
Period by period
See how Avanti Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,722 | 46.9% | 2.6% |
| Period 6 of 2026-27 | 1,709 | 40.1% | 0.5% |
| Period 5 of 2026-27 | 1,730 | 40.4% | 5.6% |
| Period 4 of 2026-27 | 1,730 | 34.0% | 7.1% |
| Period 3 of 2026-27 | 1,613 | 41.2% | 3.8% |
| Period 2 of 2026-27 | 1,587 | 47.4% | 4.5% |
| Period 1 of 2026-27 | 1,930 | 53.2% | 1.5% |
| Period 13 of 2025-26 | 1,902 | 54.2% | 4.1% |
| Period 12 of 2025-26 | 1,746 | 52.5% | 2.7% |
| Period 11 of 2025-26 | 1,678 | 54.9% | 4.2% |
| Period 10 of 2025-26 | 1,357 | 45.5% | 4.2% |
| Period 9 of 2025-26 | 1,763 | 32.5% | 7.3% |
| Period 8 of 2025-26 | 1,760 | 44.9% | 2.3% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Warrington Bank Quay
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Transport for Wales | 12,784 | 74.4% | 1.2% |
| Northern | 10,009 | 69.4% | 4.9% |
| Caledonian Sleeper | 1 | – | – |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out