Eltham
ELWLondonManaged by Southeastern
How this station is performing
Eltham had 66,870 scheduled stops to Period 7 of 2026-27, about 184 a day. 83.5% of recorded arrivals were within three minutes of the timetable and 2.0% of scheduled stops were cancelled.
Eltham opened on 1 May 1895. It was moved to the site it uses now on 17 March 1985. Among the 5 stations nearest to it with a known opening date, Mottingham is the oldest (1866) and Falconwood the newest (1936), with Eltham in between.
The nearest stations to Eltham are Mottingham (1.7 km south), Kidbrooke (1.8 km north-west), Falconwood (1.9 km east), New Eltham (2.3 km south-east) and Lee (London) (2.7 km west). 86 stations lie within 10 km in all. At 83.5%, Eltham is less punctual than all of them; the best of the five, Mottingham, manages 89.1%.
Eltham is named after New Eltham, an area of London, but the station stands 2.4 km from its centre.
2 operators call at Eltham: Southeastern (83.4%, 99% of stops) and GTR (90.0%, 1% of stops). The operator you travel with matters: GTR reaches 90.0% within three minutes while Southeastern manages 83.4%, a gap of 6.6 percentage points.
Compared with 3 stations of a similar size in London, Eltham is the least punctual, at 83.5%. All of them are ahead, including Bexleyheath (84.1%), Falconwood (86.5%) and Kidbrooke (85.1%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Southeastern | 66,482 | 83.4% | 2.0% |
| GTR | 388 | 90.0% | 1.3% |
Operators with their own page for this station are linked to it.
Late train at Eltham? Delay Repay
These operators call at Eltham and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 4,984 | 83.2% | 1.5% |
| Period 6 of 2026-27 | 5,148 | 81.7% | 1.2% |
| Period 5 of 2026-27 | 4,770 | 82.4% | 2.6% |
| Period 4 of 2026-27 | 5,286 | 85.9% | 1.5% |
| Period 3 of 2026-27 | 5,579 | 81.7% | 3.1% |
| Period 2 of 2026-27 | 4,987 | 82.4% | 5.5% |
| Period 1 of 2026-27 | 6,066 | 86.6% | 1.9% |
| Period 13 of 2025-26 | 5,206 | 84.4% | 1.3% |
| Period 12 of 2025-26 | 5,554 | 84.5% | 1.6% |
| Period 11 of 2025-26 | 4,914 | 83.7% | 1.2% |
| Period 10 of 2025-26 | 4,110 | 85.0% | 1.6% |
| Period 9 of 2025-26 | 5,313 | 81.8% | 1.3% |
| Period 8 of 2025-26 | 4,953 | 81.3% | 1.8% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in London
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Bexleyheath | 66,868 | 84.1% | 2.0% |
| Falconwood | 66,469 | 86.5% | 2.0% |
| Kidbrooke | 66,468 | 85.1% | 2.1% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out