Thornton Abbey
TNAYorkshire and The HumberManaged by East Midlands Railway
How this station is performing
Thornton Abbey had 5,165 scheduled stops to Period 7 of 2026-27, about 14 a day. 77.0% of recorded arrivals were within three minutes of the timetable and 5.0% of scheduled stops were cancelled.
Thornton Abbey opened on 18 May 1848, 178 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Thornton Abbey is the oldest; the next oldest, Goxhill, dates from 1848.
The nearest stations to Thornton Abbey are Goxhill (2.7 km north), Ulceby (4.1 km south), New Holland (5.8 km north-west), Habrough (6.4 km south-east) and Barrow Haven (6.6 km north-west). 6 stations lie within 10 km in all. Of the five, Ulceby is the most punctual at 77.4% and Goxhill the least at 72.4%, with Thornton Abbey on 77.0%.
Thornton Abbey has edged up: 77.0% of stops came within three minutes of the timetable in the latest 13 periods, 4.8 percentage points better than the 72.2% of the 13 before. Cancellations held steady at 5.0% of scheduled stops, against 5.3% before.
Compared with 3 stations of a similar size in Yorkshire and The Humber, Thornton Abbey is the most punctual, at 77.0%. The comparison group includes Barrow Haven (75.6%), Barton-on-Humber (73.7%) and Goxhill (72.4%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| East Midlands Railway | 5,165 | 77.0% | 5.0% |
Operators with their own page for this station are linked to it.
Late train at Thornton Abbey? Delay Repay
These operators call at Thornton Abbey and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 366 | 82.7% | 1.6% |
| Period 6 of 2026-27 | 416 | 81.5% | 6.3% |
| Period 5 of 2026-27 | 416 | 63.7% | 11.1% |
| Period 4 of 2026-27 | 416 | 75.1% | 2.9% |
| Period 3 of 2026-27 | 416 | 77.2% | 4.8% |
| Period 2 of 2026-27 | 392 | 76.1% | 8.4% |
| Period 1 of 2026-27 | 448 | 86.0% | 3.6% |
| Period 13 of 2025-26 | 416 | 90.4% | 3.6% |
| Period 12 of 2025-26 | 384 | 85.2% | 2.1% |
| Period 11 of 2025-26 | 381 | 81.0% | 3.9% |
| Period 10 of 2025-26 | 346 | 75.5% | 6.9% |
| Period 9 of 2025-26 | 384 | 58.8% | 5.2% |
| Period 8 of 2025-26 | 384 | 69.0% | 4.2% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Yorkshire and The Humber
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Barrow Haven | 5,165 | 75.6% | 5.0% |
| Barton-on-Humber | 5,165 | 73.7% | 5.0% |
| Goxhill | 5,165 | 72.4% | 5.0% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out