Barrow Haven
BAVYorkshire and The HumberManaged by East Midlands Railway
How this station is performing
Barrow Haven had 5,165 scheduled stops to Period 7 of 2026-27, about 14 a day. 75.6% of recorded arrivals were within three minutes of the timetable and 5.0% of scheduled stops were cancelled.
Barrow Haven opened on 1 March 1849, 177 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Barrow Haven is the newest; the oldest, Hessle, opened in 1840.
The nearest stations to Barrow Haven are New Holland (2.2 km east), Barton-on-Humber (3.5 km west), Hessle (3.9 km north-west), Goxhill (4.3 km south-east) and Hull (6.0 km north-east). 8 stations lie within 10 km in all. Of the five, Hessle is the most punctual at 80.6% and Goxhill the least at 72.4%, with Barrow Haven on 75.6%.
Barrow Haven takes its name from a hamlet called Barrow Haven, home to about 9,334 people, and the station stands 0.6 km from its centre.
Barrow Haven improved sharply over the past year. In the latest 13 periods 75.6% of stops came within three minutes of the timetable, up 5.0 percentage points from 70.6% in the 13 before. Cancellations held steady at 5.0% of scheduled stops, against 5.3% before.
Compared with 3 stations of a similar size in Yorkshire and The Humber, Barrow Haven is the most punctual, at 75.6%. The comparison group includes Barton-on-Humber (73.7%), Goxhill (72.4%) and New Holland (75.5%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| East Midlands Railway | 5,165 | 75.6% | 5.0% |
Operators with their own page for this station are linked to it.
Late train at Barrow Haven? Delay Repay
These operators call at Barrow Haven and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 366 | 82.9% | 1.6% |
| Period 6 of 2026-27 | 416 | 83.7% | 6.3% |
| Period 5 of 2026-27 | 416 | 57.1% | 11.1% |
| Period 4 of 2026-27 | 416 | 75.6% | 2.9% |
| Period 3 of 2026-27 | 416 | 76.4% | 4.8% |
| Period 2 of 2026-27 | 392 | 74.6% | 8.2% |
| Period 1 of 2026-27 | 448 | 83.7% | 3.6% |
| Period 13 of 2025-26 | 416 | 89.7% | 3.6% |
| Period 12 of 2025-26 | 384 | 82.8% | 2.1% |
| Period 11 of 2025-26 | 381 | 81.4% | 3.9% |
| Period 10 of 2025-26 | 346 | 72.0% | 6.9% |
| Period 9 of 2025-26 | 384 | 57.8% | 5.2% |
| Period 8 of 2025-26 | 384 | 67.3% | 4.2% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Yorkshire and The Humber
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Barton-on-Humber | 5,165 | 73.7% | 5.0% |
| Goxhill | 5,165 | 72.4% | 5.0% |
| New Holland | 5,165 | 75.5% | 5.0% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out