Barton-on-Humber
BAUYorkshire and The HumberManaged by East Midlands Railway
How this station is performing
Barton-on-Humber had 5,165 scheduled stops to Period 7 of 2026-27, about 14 a day. 73.7% of recorded arrivals were within three minutes of the timetable and 5.0% of scheduled stops were cancelled.
Barton-on-Humber opened on 1 March 1849, 177 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Barton-on-Humber is the newest; the oldest, Hessle, opened in 1840.
The nearest stations to Barton-on-Humber are Hessle (3.2 km north), Barrow Haven (3.5 km east), Ferriby (5.3 km north-west), New Holland (5.7 km east) and Goxhill (7.1 km east). 8 stations lie within 10 km in all. Of the five, Hessle is the most punctual at 80.6% and Goxhill the least at 72.4%, with Barton-on-Humber on 73.7%.
Barton-on-Humber is named after Barton-upon-Humber, a town, home to about 11,066 people, but the station stands 0.8 km from its centre.
Across the whole run of data, the weakest four-week period for Barton-on-Humber was Period 9 of 2023-24, at 52.9%, some time before the latest year. The strongest was Period 1 of 2023-24, at 87.8%, and the two are 34.9 percentage points apart. Cancellations peaked at 13.6% of scheduled stops in Period 10 of 2024-25, against 5.0% over the latest 13 periods.
2 of 3 stations of a similar size in Yorkshire and The Humber are more punctual than Barton-on-Humber on 73.7%. The comparison group includes Barrow Haven (75.6%), Goxhill (72.4%) and New Holland (75.5%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| East Midlands Railway | 5,165 | 73.7% | 5.0% |
Operators with their own page for this station are linked to it.
Late train at Barton-on-Humber? Delay Repay
These operators call at Barton-on-Humber and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 366 | 81.4% | 1.6% |
| Period 6 of 2026-27 | 416 | 82.6% | 6.3% |
| Period 5 of 2026-27 | 416 | 57.0% | 11.1% |
| Period 4 of 2026-27 | 416 | 71.5% | 2.9% |
| Period 3 of 2026-27 | 416 | 72.7% | 4.8% |
| Period 2 of 2026-27 | 392 | 74.2% | 8.2% |
| Period 1 of 2026-27 | 448 | 81.3% | 3.6% |
| Period 13 of 2025-26 | 416 | 85.5% | 3.6% |
| Period 12 of 2025-26 | 384 | 77.9% | 2.1% |
| Period 11 of 2025-26 | 381 | 80.1% | 3.9% |
| Period 10 of 2025-26 | 346 | 70.2% | 6.9% |
| Period 9 of 2025-26 | 384 | 54.4% | 5.2% |
| Period 8 of 2025-26 | 384 | 66.6% | 4.2% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Yorkshire and The Humber
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Barrow Haven | 5,165 | 75.6% | 5.0% |
| Goxhill | 5,165 | 72.4% | 5.0% |
| New Holland | 5,165 | 75.5% | 5.0% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out