Goxhill
GOXYorkshire and The HumberManaged by East Midlands Railway
How this station is performing
Goxhill had 5,165 scheduled stops to Period 7 of 2026-27, about 14 a day. 72.4% of recorded arrivals were within three minutes of the timetable and 5.0% of scheduled stops were cancelled.
Goxhill opened on 1 March 1848, 178 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Goxhill is the oldest; the next oldest, Thornton Abbey, dates from 1848.
The nearest stations to Goxhill are Thornton Abbey (2.7 km south), New Holland (3.2 km north-west), Barrow Haven (4.3 km north-west), Ulceby (6.8 km south) and Barton-on-Humber (7.1 km west). 8 stations lie within 10 km in all. At 72.4%, Goxhill is less punctual than all of them; the best of the five, Ulceby, manages 77.4%.
Goxhill is one of 2 stations named after a Village called Goxhill, home to about 2,290 people; this one stands 0.3 km from its centre.
Across the whole run of data, the weakest four-week period for Goxhill was Period 9 of 2023-24, at 50.9%, some time before the latest year. The strongest was Period 1 of 2023-24, at 87.2%, and the two are 36.3 percentage points apart. Cancellations peaked at 13.6% of scheduled stops in Period 10 of 2024-25, against 5.0% over the latest 13 periods.
Compared with 3 stations of a similar size in Yorkshire and The Humber, Goxhill is the least punctual, at 72.4%. All of them are ahead, including Barrow Haven (75.6%), Barton-on-Humber (73.7%) and New Holland (75.5%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| East Midlands Railway | 5,165 | 72.4% | 5.0% |
Operators with their own page for this station are linked to it.
Late train at Goxhill? Delay Repay
These operators call at Goxhill and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 366 | 82.5% | 1.6% |
| Period 6 of 2026-27 | 416 | 82.4% | 6.3% |
| Period 5 of 2026-27 | 416 | 51.2% | 11.1% |
| Period 4 of 2026-27 | 416 | 72.5% | 2.9% |
| Period 3 of 2026-27 | 416 | 73.1% | 4.8% |
| Period 2 of 2026-27 | 392 | 74.0% | 8.2% |
| Period 1 of 2026-27 | 448 | 80.6% | 3.6% |
| Period 13 of 2025-26 | 416 | 83.3% | 3.6% |
| Period 12 of 2025-26 | 384 | 77.9% | 2.1% |
| Period 11 of 2025-26 | 381 | 78.5% | 3.9% |
| Period 10 of 2025-26 | 346 | 69.4% | 6.9% |
| Period 9 of 2025-26 | 384 | 53.2% | 5.2% |
| Period 8 of 2025-26 | 384 | 63.7% | 4.2% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Yorkshire and The Humber
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Barrow Haven | 5,165 | 75.6% | 5.0% |
| Barton-on-Humber | 5,165 | 73.7% | 5.0% |
| New Holland | 5,165 | 75.5% | 5.0% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out