Skip to content

How punctual is your station? Every stop, every operator, every four weeks.

CrossCountry at Teignmouth

All trains at TeignmouthCrossCountry across BritainSouth West

On time, last 13 periods55.4%Whole station: 76.9%
Cancelled17.2%Whole station: 3.8%
Scheduled stops1,242Of 34,383 at the station

How this operator is doing here

CrossCountry had 1,242 scheduled stops at Teignmouth in the 13 periods to Period 7 of 2026-27, 4% of the station's total. 55.4% of recorded arrivals came within three minutes and 17.2% of stops were cancelled.

CrossCountry trains at Teignmouth also serve Dawlish (4.2 km north-east, 52.2% on time, 17.3% cancelled), Dawlish Warren (6.7 km north-east, – on time, – cancelled), Newton Abbot (7.6 km west, 66.8% on time, 8.9% cancelled), Torquay (10.3 km south, 70.0% on time, 21.8% cancelled), Paignton (13.5 km south, 74.1% on time, 21.8% cancelled) and Totnes (18.5 km south-west, 69.0% on time, 7.5% cancelled), which are the stations on its network closest to Teignmouth.

Within 30 km of here, CrossCountry runs best at Totnes, 18.5 km south-west (69.0%), and worst at Newton Abbot, 7.6 km west (66.8%).

The busiest CrossCountry station within 30 km of Teignmouth is Exeter St David's, 20.4 km north, with about 35 scheduled stops a day.

CrossCountry at Teignmouth has slipped sharply. 55.4% of stops came within three minutes of the timetable in the latest 13 periods, 8.2 percentage points worse than the 63.6% recorded in the 13 before. Cancellations rose to 17.2% of scheduled stops from 10.9%, which is 6.3 percentage points more.

Period by period

40%60%80%2023-242024-252025-262026-27Period 1 of 2023-24: 76.0%Period 2 of 2023-24: 66.7%Period 3 of 2023-24: 72.1%Period 4 of 2023-24: 76.9%Period 5 of 2023-24: 67.9%Period 6 of 2023-24: 59.5%Period 7 of 2023-24: 66.2%Period 8 of 2023-24: 65.2%Period 9 of 2023-24: 69.1%Period 10 of 2023-24: 70.6%Period 12 of 2023-24: 78.4%Period 13 of 2023-24: 58.2%Period 1 of 2024-25: 74.6%Period 2 of 2024-25: 68.2%Period 3 of 2024-25: 54.1%Period 4 of 2024-25: 57.1%Period 5 of 2024-25: 66.7%Period 9 of 2024-25: 63.5%Period 10 of 2024-25: 61.5%Period 11 of 2024-25: 68.8%Period 12 of 2024-25: 65.8%Period 13 of 2024-25: 78.6%Period 1 of 2025-26: 77.6%Period 2 of 2025-26: 63.6%Period 3 of 2025-26: 55.7%Period 4 of 2025-26: 50.5%Period 5 of 2025-26: 64.6%Period 6 of 2025-26: 52.5%Period 7 of 2025-26: 57.3%Period 8 of 2025-26: 51.2%Period 9 of 2025-26: 52.9%Period 10 of 2025-26: 55.9%Period 11 of 2025-26: 56.8%Period 12 of 2025-26: 64.3%Period 13 of 2025-26: 57.7%Period 1 of 2026-27: 60.6%Period 2 of 2026-27: 56.2%Period 3 of 2026-27: 53.0%Period 4 of 2026-27: 47.7%Period 5 of 2026-27: 43.4%Period 6 of 2026-27: 57.0%Period 7 of 2026-27: 64.2%
This pageGreat Britain
0%10%20%30%40%50%Period 1 of 2023-24: 10.7%Period 2 of 2023-24: 5.0%Period 3 of 2023-24: 33.7%Period 4 of 2023-24: 50.0%Period 5 of 2023-24: 17.0%Period 6 of 2023-24: 14.1%Period 7 of 2023-24: 7.1%Period 8 of 2023-24: 26.6%Period 9 of 2023-24: 45.0%Period 10 of 2023-24: 37.8%Period 12 of 2023-24: 7.4%Period 13 of 2023-24: 6.8%Period 1 of 2024-25: 12.5%Period 2 of 2024-25: 13.2%Period 3 of 2024-25: 13.3%Period 4 of 2024-25: 24.5%Period 5 of 2024-25: 11.1%Period 9 of 2024-25: 28.2%Period 10 of 2024-25: 11.4%Period 11 of 2024-25: 4.9%Period 12 of 2024-25: 2.5%Period 13 of 2024-25: 1.0%Period 1 of 2025-26: 12.2%Period 2 of 2025-26: 4.9%Period 3 of 2025-26: 15.4%Period 4 of 2025-26: 12.5%Period 5 of 2025-26: 7.7%Period 6 of 2025-26: 14.9%Period 7 of 2025-26: 12.8%Period 8 of 2025-26: 18.4%Period 9 of 2025-26: 32.7%Period 10 of 2025-26: 33.0%Period 11 of 2025-26: 21.4%Period 12 of 2025-26: 5.4%Period 13 of 2025-26: 3.7%Period 1 of 2026-27: 5.5%Period 2 of 2026-27: 14.4%Period 3 of 2026-27: 9.8%Period 4 of 2026-27: 11.3%Period 5 of 2026-27: 24.8%Period 6 of 2026-27: 17.3%Period 7 of 2026-27: 22.1%2023-242024-252025-262026-27

See how CrossCountry Delay Repay works

The last 13 periods

PeriodScheduled stopsWithin 3 minCancelled
Period 7 of 2026-278664.2%22.1%
Period 6 of 2026-2710457.0%17.3%
Period 5 of 2026-2710143.4%24.8%
Period 4 of 2026-279747.7%11.3%
Period 3 of 2026-279253.0%9.8%
Period 2 of 2026-2710456.2%14.4%
Period 1 of 2026-2711060.6%5.5%
Period 13 of 2025-268157.7%3.7%
Period 12 of 2025-267464.3%5.4%
Period 11 of 2025-2610356.8%21.4%
Period 10 of 2025-268855.9%33.0%
Period 9 of 2025-2610452.9%32.7%
Period 8 of 2025-269851.2%18.4%

Time of year

50%60%70%80%90%P1: 70.9%1P2: 63.0%2P3: 57.7%3P4: 54.9%4P5: 60.9%5P6: 56.3%6P7: 62.2%7P8: 57.7%8P9: 61.3%9P10: 62.2%10P11: 63.3%11P12: 70.0%12P13: 66.9%13

Each point averages that period of the railway year over every year in the data. Period 1 starts in April.

Other operators at Teignmouth

OperatorScheduled stopsWithin 3 minCancelled
Great Western Railway33,14177.6%3.3%

On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out