How this operator is doing here
CrossCountry had 1,242 scheduled stops at Teignmouth in the 13 periods to Period 7 of 2026-27, 4% of the station's total. 55.4% of recorded arrivals came within three minutes and 17.2% of stops were cancelled.
CrossCountry trains at Teignmouth also serve Dawlish (4.2 km north-east, 52.2% on time, 17.3% cancelled), Dawlish Warren (6.7 km north-east, – on time, – cancelled), Newton Abbot (7.6 km west, 66.8% on time, 8.9% cancelled), Torquay (10.3 km south, 70.0% on time, 21.8% cancelled), Paignton (13.5 km south, 74.1% on time, 21.8% cancelled) and Totnes (18.5 km south-west, 69.0% on time, 7.5% cancelled), which are the stations on its network closest to Teignmouth.
Within 30 km of here, CrossCountry runs best at Totnes, 18.5 km south-west (69.0%), and worst at Newton Abbot, 7.6 km west (66.8%).
The busiest CrossCountry station within 30 km of Teignmouth is Exeter St David's, 20.4 km north, with about 35 scheduled stops a day.
CrossCountry at Teignmouth has slipped sharply. 55.4% of stops came within three minutes of the timetable in the latest 13 periods, 8.2 percentage points worse than the 63.6% recorded in the 13 before. Cancellations rose to 17.2% of scheduled stops from 10.9%, which is 6.3 percentage points more.
Period by period
See how CrossCountry Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 86 | 64.2% | 22.1% |
| Period 6 of 2026-27 | 104 | 57.0% | 17.3% |
| Period 5 of 2026-27 | 101 | 43.4% | 24.8% |
| Period 4 of 2026-27 | 97 | 47.7% | 11.3% |
| Period 3 of 2026-27 | 92 | 53.0% | 9.8% |
| Period 2 of 2026-27 | 104 | 56.2% | 14.4% |
| Period 1 of 2026-27 | 110 | 60.6% | 5.5% |
| Period 13 of 2025-26 | 81 | 57.7% | 3.7% |
| Period 12 of 2025-26 | 74 | 64.3% | 5.4% |
| Period 11 of 2025-26 | 103 | 56.8% | 21.4% |
| Period 10 of 2025-26 | 88 | 55.9% | 33.0% |
| Period 9 of 2025-26 | 104 | 52.9% | 32.7% |
| Period 8 of 2025-26 | 98 | 51.2% | 18.4% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Teignmouth
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Great Western Railway | 33,141 | 77.6% | 3.3% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out