Stapleton Road
SRDSouth WestManaged by Great Western Railway
How this station is performing
Stapleton Road had 34,630 scheduled stops to Period 7 of 2026-27, about 95 a day. 79.2% of recorded arrivals were within three minutes of the timetable and 4.6% of scheduled stops were cancelled.
Stapleton Road opened on 8 September 1863, 163 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Bristol Temple Meads is the oldest (1840) and Redland the newest (1897), with Stapleton Road in between.
The nearest stations to Stapleton Road are Lawrence Hill (1.0 km south), Ashley Down (1.4 km north-west), Montpelier (1.5 km west), Redland (2.3 km west) and Bristol Temple Meads (2.3 km south-west). 16 stations lie within 10 km in all. Of the five, Ashley Down is the most punctual at 84.7% and Bristol Temple Meads the least at 70.8%, with Stapleton Road on 79.2%.
Stapleton Road is named after Stapleton, a suburb, but the station stands 1.6 km from its centre.
Across the whole run of data, the weakest four-week period for Stapleton Road was Period 9 of 2024-25, at 64.3%, some time before the latest year. The strongest was Period 12 of 2025-26, at 87.9%, and the two are 23.6 percentage points apart. Cancellations peaked at 11.9% of scheduled stops in Period 9 of 2024-25, against 4.6% over the latest 13 periods.
1 of 3 stations of a similar size in South West are more punctual than Stapleton Road on 79.2%. The comparison group includes Lawrence Hill (82.8%), Dawlish (76.5%) and Teignmouth (76.9%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Great Western Railway | 34,630 | 79.2% | 4.6% |
Operators with their own page for this station are linked to it.
Late train at Stapleton Road? Delay Repay
These operators call at Stapleton Road and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 2,732 | 76.4% | 3.8% |
| Period 6 of 2026-27 | 2,420 | 78.6% | 6.1% |
| Period 5 of 2026-27 | 2,075 | 72.3% | 8.7% |
| Period 4 of 2026-27 | 2,732 | 75.1% | 9.8% |
| Period 3 of 2026-27 | 2,533 | 80.3% | 8.9% |
| Period 2 of 2026-27 | 2,718 | 75.4% | 4.6% |
| Period 1 of 2026-27 | 3,164 | 83.1% | 1.4% |
| Period 13 of 2025-26 | 2,986 | 83.6% | 2.7% |
| Period 12 of 2025-26 | 2,728 | 87.9% | 1.5% |
| Period 11 of 2025-26 | 2,735 | 85.4% | 2.6% |
| Period 10 of 2025-26 | 2,456 | 75.9% | 5.1% |
| Period 9 of 2025-26 | 2,732 | 73.4% | 5.1% |
| Period 8 of 2025-26 | 2,619 | 77.7% | 2.0% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South West
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Lawrence Hill | 34,630 | 82.8% | 4.6% |
| Dawlish | 34,383 | 76.5% | 3.8% |
| Teignmouth | 34,383 | 76.9% | 3.8% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out