Lawrence Hill
LWHSouth WestManaged by Great Western Railway
How this station is performing
Lawrence Hill had 34,630 scheduled stops to Period 7 of 2026-27, about 95 a day. 82.8% of recorded arrivals were within three minutes of the timetable and 4.6% of scheduled stops were cancelled.
Lawrence Hill opened on 8 September 1863, 163 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Bristol Temple Meads is the oldest (1840) and Redland the newest (1897), with Lawrence Hill in between.
The nearest stations to Lawrence Hill are Stapleton Road (1.0 km north), Bristol Temple Meads (1.5 km south-west), Montpelier (2.0 km north-west), Ashley Down (2.4 km north) and Redland (2.7 km north-west). 15 stations lie within 10 km in all. Of the five, Ashley Down is the most punctual at 84.7% and Bristol Temple Meads the least at 70.8%, with Lawrence Hill on 82.8%.
Across the whole run of data, the weakest four-week period for Lawrence Hill was Period 9 of 2024-25, at 69.1%, some time before the latest year. The strongest was Period 12 of 2025-26, at 91.2%, and the two are 22.1 percentage points apart. Cancellations peaked at 11.9% of scheduled stops in Period 9 of 2024-25, against 4.6% over the latest 13 periods.
Compared with 3 stations of a similar size in South West, Lawrence Hill is the most punctual, at 82.8%. The comparison group includes Stapleton Road (79.2%), Dawlish (76.5%) and Teignmouth (76.9%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Great Western Railway | 34,630 | 82.8% | 4.6% |
Operators with their own page for this station are linked to it.
Late train at Lawrence Hill? Delay Repay
These operators call at Lawrence Hill and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 2,732 | 80.3% | 3.8% |
| Period 6 of 2026-27 | 2,420 | 82.2% | 6.1% |
| Period 5 of 2026-27 | 2,075 | 76.6% | 8.8% |
| Period 4 of 2026-27 | 2,732 | 78.9% | 9.8% |
| Period 3 of 2026-27 | 2,533 | 83.5% | 8.9% |
| Period 2 of 2026-27 | 2,718 | 78.4% | 4.6% |
| Period 1 of 2026-27 | 3,164 | 86.9% | 1.4% |
| Period 13 of 2025-26 | 2,986 | 86.7% | 2.7% |
| Period 12 of 2025-26 | 2,728 | 91.2% | 1.5% |
| Period 11 of 2025-26 | 2,735 | 88.3% | 2.6% |
| Period 10 of 2025-26 | 2,456 | 79.6% | 5.1% |
| Period 9 of 2025-26 | 2,732 | 77.8% | 5.1% |
| Period 8 of 2025-26 | 2,619 | 81.7% | 2.0% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South West
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Stapleton Road | 34,630 | 79.2% | 4.6% |
| Dawlish | 34,383 | 76.5% | 3.8% |
| Teignmouth | 34,383 | 76.9% | 3.8% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out