ScotRail at Stonehaven
How this operator is doing here
ScotRail had 20,609 scheduled stops at Stonehaven in the 13 periods to Period 7 of 2026-27, 85% of the station's total. 81.2% of recorded arrivals came within three minutes and 1.9% of stops were cancelled.
ScotRail trains at Stonehaven also serve Portlethen (12.0 km north-east, – on time, 2.2% cancelled), Laurencekirk (20.5 km south-west, 82.4% on time, 2.2% cancelled), Aberdeen (21.0 km north, 86.6% on time, 1.6% cancelled), Dyce (26.6 km north, 88.3% on time, 2.0% cancelled), Kintore (31.7 km north, 88.8% on time, 2.0% cancelled) and Montrose (32.0 km south-west, 76.1% on time, 1.8% cancelled), which are the stations on its network closest to Stonehaven.
Within 30 km of here, ScotRail runs best at Dyce, 26.6 km north (88.3%), and worst at Laurencekirk, 20.5 km south-west (82.4%).
The busiest ScotRail station within 30 km of Stonehaven is Aberdeen, 21.0 km north, with about 118 scheduled stops a day.
ScotRail ranks 2nd of the 3 operators with enough records at Stonehaven, on 81.2%.
For ScotRail, Stonehaven is the 261st best of 312 ranked stations. Its 81.2% here is 6.7 percentage points below the 87.9% across the whole network.
Over three full railway years ScotRail at Stonehaven has improved each time, from 78.0% within three minutes in 2023-24 to 78.5% in 2024-25 and 81.2% in 2025-26.
Period by period
See how ScotRail Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,628 | 80.1% | 1.2% |
| Period 6 of 2026-27 | 1,628 | 87.8% | 1.3% |
| Period 5 of 2026-27 | 1,625 | 83.1% | 3.4% |
| Period 4 of 2026-27 | 1,628 | 83.0% | 1.2% |
| Period 3 of 2026-27 | 1,628 | 84.8% | 1.5% |
| Period 2 of 2026-27 | 1,610 | 87.0% | 1.1% |
| Period 1 of 2026-27 | 1,835 | 86.8% | 1.5% |
| Period 13 of 2025-26 | 1,747 | 84.2% | 1.8% |
| Period 12 of 2025-26 | 1,353 | 79.3% | 2.0% |
| Period 11 of 2025-26 | 1,416 | 68.5% | 2.5% |
| Period 10 of 2025-26 | 1,375 | 71.0% | 3.3% |
| Period 9 of 2025-26 | 1,568 | 78.6% | 2.1% |
| Period 8 of 2025-26 | 1,568 | 76.8% | 2.4% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Stonehaven
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| LNER | 2,669 | 66.8% | 1.9% |
| CrossCountry | 781 | 85.4% | 11.1% |
| Caledonian Sleeper | 285 | – | – |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out