LNER at Stonehaven
How this operator is doing here
LNER had 2,669 scheduled stops at Stonehaven in the 13 periods to Period 7 of 2026-27, 11% of the station's total. 66.8% of recorded arrivals came within three minutes and 1.9% of stops were cancelled.
LNER trains at Stonehaven also serve Laurencekirk (20.5 km south-west, – on time, – cancelled), Aberdeen (21.0 km north, 73.3% on time, 1.9% cancelled), Montrose (32.0 km south-west, 63.0% on time, 1.8% cancelled), Arbroath (50.4 km south-west, 62.4% on time, 1.8% cancelled), Carnoustie (59.5 km south-west, – on time, – cancelled) and Dundee (72.7 km south-west, 67.3% on time, 1.6% cancelled), which are the stations on its network closest to Stonehaven.
The busiest LNER station within 30 km of Stonehaven is Aberdeen, 21.0 km north, with about 7 scheduled stops a day.
Of the 3 operators with enough records at Stonehaven, LNER is the least punctual, at 66.8%.
For LNER, Stonehaven is the 16th best of 35 ranked stations. Its 66.8% here is 0.8 percentage points below the 67.6% across the whole network.
LNER at Stonehaven has slipped sharply. 66.8% of stops came within three minutes of the timetable in the latest 13 periods, 8.1 percentage points worse than the 74.9% recorded in the 13 before. Cancellations rose to 1.9% of scheduled stops from 0.8%, which is 1.1 percentage points more.
Period by period
See how LNER Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 208 | 67.3% | 1.0% |
| Period 6 of 2026-27 | 208 | 63.7% | 1.9% |
| Period 5 of 2026-27 | 208 | 60.3% | 1.9% |
| Period 4 of 2026-27 | 208 | 62.3% | 0.0% |
| Period 3 of 2026-27 | 208 | 65.7% | 1.9% |
| Period 2 of 2026-27 | 206 | 70.1% | 1.0% |
| Period 1 of 2026-27 | 235 | 65.2% | 2.1% |
| Period 13 of 2025-26 | 228 | 67.7% | 0.9% |
| Period 12 of 2025-26 | 176 | 68.0% | 2.3% |
| Period 11 of 2025-26 | 188 | 63.8% | 5.9% |
| Period 10 of 2025-26 | 180 | 63.4% | 2.8% |
| Period 9 of 2025-26 | 208 | 74.1% | 1.4% |
| Period 8 of 2025-26 | 208 | 76.5% | 1.9% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Stonehaven
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| ScotRail | 20,609 | 81.2% | 1.9% |
| CrossCountry | 781 | 85.4% | 11.1% |
| Caledonian Sleeper | 285 | – | – |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out