CrossCountry at Stonehaven
How this operator is doing here
CrossCountry had 781 scheduled stops at Stonehaven in the 13 periods to Period 7 of 2026-27, 3% of the station's total. 85.4% of recorded arrivals came within three minutes and 11.1% of stops were cancelled.
CrossCountry trains at Stonehaven also serve Laurencekirk (20.5 km south-west, – on time, – cancelled), Aberdeen (21.0 km north, 76.1% on time, 15.6% cancelled), Montrose (32.0 km south-west, 76.3% on time, 10.9% cancelled), Arbroath (50.4 km south-west, 73.7% on time, 10.6% cancelled), Dundee (72.7 km south-west, 66.8% on time, 13.5% cancelled) and Leuchars (For St. Andrews) (77.5 km south-west, 54.3% on time, 13.6% cancelled), which are the stations on its network closest to Stonehaven.
The busiest CrossCountry station within 30 km of Stonehaven is Aberdeen, 21.0 km north, with about 3 scheduled stops a day.
Of the 3 operators with enough records at Stonehaven, CrossCountry is the most punctual, at 85.4%.
CrossCountry cancels more at Stonehaven than elsewhere: 11.1% of scheduled stops, against 5.9% across its network and 2.2% for every operator at the station.
Alongside CrossCountry, the other operators at Stonehaven are ScotRail (81.2%, 85% of stops), LNER (66.8%, 11% of stops) and Caledonian Sleeper (–, 1% of stops), so passengers here can compare several services.
Period by period
See how CrossCountry Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 54 | – | – |
| Period 6 of 2026-27 | 75 | 84.5% | 5.3% |
| Period 5 of 2026-27 | 76 | 84.5% | 6.6% |
| Period 4 of 2026-27 | 76 | 89.9% | 9.2% |
| Period 3 of 2026-27 | 67 | 89.8% | 11.9% |
| Period 2 of 2026-27 | 72 | 89.8% | 18.1% |
| Period 1 of 2026-27 | 77 | 86.9% | 20.8% |
| Period 13 of 2025-26 | 75 | 82.6% | 8.0% |
| Period 12 of 2025-26 | 59 | 74.1% | 8.5% |
| Period 11 of 2025-26 | 48 | – | – |
| Period 10 of 2025-26 | 47 | – | – |
| Period 9 of 2025-26 | 28 | – | – |
| Period 8 of 2025-26 | 27 | – | – |
Other operators at Stonehaven
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| ScotRail | 20,609 | 81.2% | 1.9% |
| LNER | 2,669 | 66.8% | 1.9% |
| Caledonian Sleeper | 285 | – | – |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out