Stonebridge Park had 51,431 scheduled stops to Period 7 of 2026-27, about 141 a day. 91.9% of recorded arrivals were within three minutes of the timetable and 2.9% of scheduled stops were cancelled.
Stonebridge Park opened on 15 June 1912, 114 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Stonebridge Park is the newest; the oldest, Wembley Central, opened in 1842.
The nearest stations to Stonebridge Park are Wembley Stadium (1.3 km north-west), Harlesden (1.5 km south-east), Wembley Central (1.7 km north-west), Willesden Junction (2.6 km south-east) and North Wembley (2.8 km north-west). 64 stations lie within 10 km in all. Of the five, Harlesden is the most punctual at 92.3% and Willesden Junction the least at 86.2%, with Stonebridge Park on 91.9%.
Stonebridge Park takes its name from an area of London called Stonebridge Park, and the station stands 0.3 km from its centre.
Stonebridge Park has slipped a little, from 94.5% within three minutes in the previous 13 periods to 91.9% in the latest 13, a fall of 2.6 percentage points. Cancellations rose to 2.9% of scheduled stops from 1.9%, which is 1.0 percentage points more.
1 of 3 stations of a similar size in London are more punctual than Stonebridge Park on 91.9%. The comparison group includes Harlesden (92.3%), Hatch End (87.0%) and Headstone Lane (87.4%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| London Overground | 51,431 | 91.9% | 2.9% |
Operators with their own page for this station are linked to it.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 3,986 | 91.8% | 1.6% |
| Period 6 of 2026-27 | 3,879 | 90.7% | 5.0% |
| Period 5 of 2026-27 | 3,769 | 92.9% | 4.8% |
| Period 4 of 2026-27 | 4,051 | 88.2% | 2.7% |
| Period 3 of 2026-27 | 3,930 | 91.3% | 2.2% |
| Period 2 of 2026-27 | 3,901 | 92.8% | 3.6% |
| Period 1 of 2026-27 | 4,074 | 92.2% | 1.8% |
| Period 13 of 2025-26 | 4,356 | 93.8% | 1.4% |
| Period 12 of 2025-26 | 3,907 | 91.5% | 2.4% |
| Period 11 of 2025-26 | 4,032 | 92.2% | 2.7% |
| Period 10 of 2025-26 | 3,734 | 92.6% | 2.7% |
| Period 9 of 2025-26 | 3,764 | 91.1% | 3.8% |
| Period 8 of 2025-26 | 4,048 | 93.7% | 2.9% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in London
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Harlesden | 51,431 | 92.3% | 2.9% |
| Hatch End | 51,431 | 87.0% | 3.3% |
| Headstone Lane | 51,431 | 87.4% | 3.3% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out