Skip to content

How punctual is your station? Every stop, every operator, every four weeks.

Headstone Lane

HDLLondonManaged by London Overground

On time, last 13 periods87.4%Great Britain: 83.6%
Cancelled3.3%Great Britain: 3.2%
Stops a day141Scheduled, on average
Punctuality rank822nd of 2,374Among ranked stations

How this station is performing

Headstone Lane had 51,431 scheduled stops to Period 7 of 2026-27, about 141 a day. 87.4% of recorded arrivals were within three minutes of the timetable and 3.3% of scheduled stops were cancelled.

Headstone Lane opened on 10 February 1913, 113 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Harrow and Wealdstone is the oldest (1837) and Carpenders Park the newest (1914), with Headstone Lane in between.

The nearest stations to Headstone Lane are Hatch End (1.1 km north-west), Harrow and Wealdstone (1.9 km south-east), Harrow-on-the-Hill (2.9 km south-east), Carpenders Park (3.4 km north-west) and Kenton (3.6 km south-east). 30 stations lie within 10 km in all. Of the five, Harrow-on-the-Hill is the most punctual at 88.2% and Harrow and Wealdstone the least at 83.5%, with Headstone Lane on 87.4%.

Headstone Lane is named after Headstone, an area of London, home to about 21,228 people, but the station stands 0.5 km from its centre.

1 of 3 stations of a similar size in London are more punctual than Headstone Lane on 87.4%. The comparison group includes Harlesden (92.3%), Hatch End (87.0%) and Kenton (86.5%).

Period by period

75%80%85%90%95%2023-242024-252025-262026-27Period 1 of 2023-24: 90.4%Period 2 of 2023-24: 91.2%Period 3 of 2023-24: 89.2%Period 4 of 2023-24: 89.9%Period 6 of 2023-24: 89.7%Period 7 of 2023-24: 88.9%Period 8 of 2023-24: 90.9%Period 9 of 2023-24: 88.3%Period 10 of 2023-24: 92.1%Period 11 of 2023-24: 93.0%Period 12 of 2023-24: 91.3%Period 13 of 2023-24: 92.3%Period 1 of 2024-25: 91.7%Period 2 of 2024-25: 93.1%Period 3 of 2024-25: 91.3%Period 4 of 2024-25: 90.4%Period 5 of 2024-25: 88.7%Period 6 of 2024-25: 92.1%Period 7 of 2024-25: 91.3%Period 8 of 2024-25: 92.5%Period 9 of 2024-25: 89.1%Period 10 of 2024-25: 91.0%Period 11 of 2024-25: 91.6%Period 12 of 2024-25: 92.5%Period 13 of 2024-25: 92.3%Period 1 of 2025-26: 93.1%Period 2 of 2025-26: 92.0%Period 3 of 2025-26: 90.7%Period 4 of 2025-26: 89.3%Period 5 of 2025-26: 90.6%Period 6 of 2025-26: 90.3%Period 7 of 2025-26: 93.0%Period 8 of 2025-26: 91.4%Period 9 of 2025-26: 86.7%Period 10 of 2025-26: 86.8%Period 11 of 2025-26: 87.4%Period 12 of 2025-26: 87.8%Period 13 of 2025-26: 89.8%Period 1 of 2026-27: 88.4%Period 2 of 2026-27: 88.8%Period 3 of 2026-27: 85.1%Period 4 of 2026-27: 82.7%Period 5 of 2026-27: 89.1%Period 6 of 2026-27: 86.1%Period 7 of 2026-27: 86.2%
This pageGreat Britain
0%2%4%6%Period 1 of 2023-24: 1.8%Period 2 of 2023-24: 0.9%Period 3 of 2023-24: 3.6%Period 4 of 2023-24: 2.3%Period 6 of 2023-24: 1.8%Period 7 of 2023-24: 4.0%Period 8 of 2023-24: 2.6%Period 9 of 2023-24: 5.4%Period 10 of 2023-24: 1.8%Period 11 of 2023-24: 3.3%Period 12 of 2023-24: 2.2%Period 13 of 2023-24: 3.8%Period 1 of 2024-25: 4.4%Period 2 of 2024-25: 1.3%Period 3 of 2024-25: 2.8%Period 4 of 2024-25: 1.6%Period 5 of 2024-25: 2.1%Period 6 of 2024-25: 1.1%Period 7 of 2024-25: 2.6%Period 8 of 2024-25: 3.7%Period 9 of 2024-25: 1.6%Period 10 of 2024-25: 3.2%Period 11 of 2024-25: 3.2%Period 12 of 2024-25: 1.4%Period 13 of 2024-25: 1.2%Period 1 of 2025-26: 2.0%Period 2 of 2025-26: 1.3%Period 3 of 2025-26: 1.4%Period 4 of 2025-26: 2.6%Period 5 of 2025-26: 1.5%Period 6 of 2025-26: 1.9%Period 7 of 2025-26: 1.8%Period 8 of 2025-26: 3.5%Period 9 of 2025-26: 4.3%Period 10 of 2025-26: 2.9%Period 11 of 2025-26: 3.1%Period 12 of 2025-26: 2.8%Period 13 of 2025-26: 1.5%Period 1 of 2026-27: 2.5%Period 2 of 2026-27: 4.0%Period 3 of 2026-27: 2.7%Period 4 of 2026-27: 3.4%Period 5 of 2026-27: 5.1%Period 6 of 2026-27: 5.7%Period 7 of 2026-27: 2.2%2023-242024-252025-262026-27

Operators calling here

OperatorScheduled stopsWithin 3 minCancelled
London Overground51,43187.4%3.3%

Operators with their own page for this station are linked to it.

The last 13 periods

PeriodScheduled stopsWithin 3 minCancelled
Period 7 of 2026-273,98686.2%2.2%
Period 6 of 2026-273,87986.1%5.7%
Period 5 of 2026-273,76989.1%5.1%
Period 4 of 2026-274,05182.7%3.4%
Period 3 of 2026-273,93085.1%2.7%
Period 2 of 2026-273,90188.8%4.0%
Period 1 of 2026-274,07488.4%2.5%
Period 13 of 2025-264,35689.8%1.5%
Period 12 of 2025-263,90787.8%2.8%
Period 11 of 2025-264,03287.4%3.1%
Period 10 of 2025-263,73486.8%2.9%
Period 9 of 2025-263,76486.7%4.3%
Period 8 of 2025-264,04891.4%3.5%

Time of year

75%80%85%90%95%P1: 90.8%1P2: 91.3%2P3: 89.1%3P4: 88.1%4P5: 89.5%5P6: 89.6%6P7: 89.8%7P8: 91.6%8P9: 88.0%9P10: 90.0%10P11: 90.7%11P12: 90.5%12P13: 91.4%13

Each point averages that period of the railway year over every year in the data. Period 1 starts in April.

Similar stations in London

StationScheduled stopsWithin 3 minCancelled
Harlesden51,43192.3%2.9%
Hatch End51,43187.0%3.3%
Kenton51,43186.5%2.9%

On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out