Harlesden
HDNLondonManaged by London Underground
How this station is performing
Harlesden had 51,431 scheduled stops to Period 7 of 2026-27, about 141 a day. 92.3% of recorded arrivals were within three minutes of the timetable and 2.9% of scheduled stops were cancelled.
Harlesden opened on 15 June 1912, 114 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Kensal Rise is the oldest (1861) and Kensal Green the newest (1916), with Harlesden in between.
The nearest stations to Harlesden are Willesden Junction (1.1 km south-east), Stonebridge Park (1.5 km north-west), Acton Main Line (2.3 km south), Kensal Green (2.5 km east) and Kensal Rise (2.6 km east). 72 stations lie within 10 km in all. At 92.3%, Harlesden is more punctual than every one of them; the best of the five, Stonebridge Park, manages 91.9%.
Harlesden takes its name from an area of London called Harlesden, and the station stands 0.7 km from its centre.
Harlesden has slipped a little, from 95.1% within three minutes in the previous 13 periods to 92.3% in the latest 13, a fall of 2.8 percentage points. Cancellations rose to 2.9% of scheduled stops from 1.9%, which is 1.0 percentage points more.
Compared with 3 stations of a similar size in London, Harlesden is the most punctual, at 92.3%. The comparison group includes Hatch End (87.0%), Headstone Lane (87.4%) and Kenton (86.5%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| London Overground | 51,431 | 92.3% | 2.9% |
Operators with their own page for this station are linked to it.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 3,986 | 88.8% | 1.6% |
| Period 6 of 2026-27 | 3,879 | 89.3% | 5.0% |
| Period 5 of 2026-27 | 3,769 | 93.4% | 4.8% |
| Period 4 of 2026-27 | 4,051 | 89.3% | 2.7% |
| Period 3 of 2026-27 | 3,930 | 92.3% | 2.2% |
| Period 2 of 2026-27 | 3,901 | 93.4% | 3.6% |
| Period 1 of 2026-27 | 4,074 | 93.1% | 1.8% |
| Period 13 of 2025-26 | 4,356 | 94.9% | 1.3% |
| Period 12 of 2025-26 | 3,907 | 93.3% | 2.4% |
| Period 11 of 2025-26 | 4,032 | 92.9% | 2.7% |
| Period 10 of 2025-26 | 3,734 | 93.5% | 2.7% |
| Period 9 of 2025-26 | 3,764 | 91.6% | 3.8% |
| Period 8 of 2025-26 | 4,048 | 94.2% | 2.9% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in London
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Hatch End | 51,431 | 87.0% | 3.3% |
| Headstone Lane | 51,431 | 87.4% | 3.3% |
| Kenton | 51,431 | 86.5% | 2.9% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out