Hatch End
HTELondonManaged by London Overground
How this station is performing
Hatch End had 51,431 scheduled stops to Period 7 of 2026-27, about 141 a day. 87.0% of recorded arrivals were within three minutes of the timetable and 3.3% of scheduled stops were cancelled.
Hatch End opened on 8 August 1842, 184 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Harrow and Wealdstone is the oldest (1837) and Carpenders Park the newest (1914), with Hatch End in between.
The nearest stations to Hatch End are Headstone Lane (1.1 km south-east), Carpenders Park (2.3 km north-west), Harrow and Wealdstone (3.0 km south-east), Harrow-on-the-Hill (4.0 km south-east) and Bushey (4.2 km north). 29 stations lie within 10 km in all. Of the five, Harrow-on-the-Hill is the most punctual at 88.2% and Harrow and Wealdstone the least at 83.5%, with Hatch End on 87.0%.
Hatch End takes its name from an area of London called Hatch End, home to about 10,693 people, and the station stands 1.0 km from its centre.
2 of 3 stations of a similar size in London are more punctual than Hatch End on 87.0%. The comparison group includes Harlesden (92.3%), Headstone Lane (87.4%) and Kenton (86.5%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| London Overground | 51,431 | 87.0% | 3.3% |
Operators with their own page for this station are linked to it.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 3,986 | 85.7% | 2.3% |
| Period 6 of 2026-27 | 3,879 | 85.8% | 5.7% |
| Period 5 of 2026-27 | 3,769 | 88.6% | 5.1% |
| Period 4 of 2026-27 | 4,051 | 82.0% | 3.4% |
| Period 3 of 2026-27 | 3,930 | 84.5% | 2.7% |
| Period 2 of 2026-27 | 3,901 | 88.4% | 4.0% |
| Period 1 of 2026-27 | 4,074 | 88.2% | 2.5% |
| Period 13 of 2025-26 | 4,356 | 89.2% | 1.5% |
| Period 12 of 2025-26 | 3,907 | 87.4% | 2.8% |
| Period 11 of 2025-26 | 4,032 | 86.9% | 3.1% |
| Period 10 of 2025-26 | 3,734 | 86.5% | 2.9% |
| Period 9 of 2025-26 | 3,764 | 86.3% | 4.3% |
| Period 8 of 2025-26 | 4,048 | 91.0% | 3.5% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in London
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Harlesden | 51,431 | 92.3% | 2.9% |
| Headstone Lane | 51,431 | 87.4% | 3.3% |
| Kenton | 51,431 | 86.5% | 2.9% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out