Skip to content

How punctual is your station? Every stop, every operator, every four weeks.

Hatch End

HTELondonManaged by London Overground

On time, last 13 periods87.0%Great Britain: 83.6%
Cancelled3.3%Great Britain: 3.2%
Stops a day141Scheduled, on average
Punctuality rank869th of 2,374Among ranked stations

How this station is performing

Hatch End had 51,431 scheduled stops to Period 7 of 2026-27, about 141 a day. 87.0% of recorded arrivals were within three minutes of the timetable and 3.3% of scheduled stops were cancelled.

Hatch End opened on 8 August 1842, 184 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Harrow and Wealdstone is the oldest (1837) and Carpenders Park the newest (1914), with Hatch End in between.

The nearest stations to Hatch End are Headstone Lane (1.1 km south-east), Carpenders Park (2.3 km north-west), Harrow and Wealdstone (3.0 km south-east), Harrow-on-the-Hill (4.0 km south-east) and Bushey (4.2 km north). 29 stations lie within 10 km in all. Of the five, Harrow-on-the-Hill is the most punctual at 88.2% and Harrow and Wealdstone the least at 83.5%, with Hatch End on 87.0%.

Hatch End takes its name from an area of London called Hatch End, home to about 10,693 people, and the station stands 1.0 km from its centre.

2 of 3 stations of a similar size in London are more punctual than Hatch End on 87.0%. The comparison group includes Harlesden (92.3%), Headstone Lane (87.4%) and Kenton (86.5%).

Period by period

75%80%85%90%95%2023-242024-252025-262026-27Period 1 of 2023-24: 90.1%Period 2 of 2023-24: 90.7%Period 3 of 2023-24: 88.6%Period 4 of 2023-24: 89.6%Period 6 of 2023-24: 89.6%Period 7 of 2023-24: 88.9%Period 8 of 2023-24: 90.6%Period 9 of 2023-24: 88.2%Period 10 of 2023-24: 91.8%Period 11 of 2023-24: 92.6%Period 12 of 2023-24: 90.9%Period 13 of 2023-24: 92.2%Period 1 of 2024-25: 91.5%Period 2 of 2024-25: 92.7%Period 3 of 2024-25: 90.9%Period 4 of 2024-25: 90.0%Period 5 of 2024-25: 88.3%Period 6 of 2024-25: 91.7%Period 7 of 2024-25: 91.0%Period 8 of 2024-25: 92.3%Period 9 of 2024-25: 88.5%Period 10 of 2024-25: 90.5%Period 11 of 2024-25: 91.0%Period 12 of 2024-25: 92.1%Period 13 of 2024-25: 92.0%Period 1 of 2025-26: 92.9%Period 2 of 2025-26: 91.8%Period 3 of 2025-26: 90.6%Period 4 of 2025-26: 88.9%Period 5 of 2025-26: 90.2%Period 6 of 2025-26: 89.9%Period 7 of 2025-26: 92.3%Period 8 of 2025-26: 91.0%Period 9 of 2025-26: 86.3%Period 10 of 2025-26: 86.5%Period 11 of 2025-26: 86.9%Period 12 of 2025-26: 87.4%Period 13 of 2025-26: 89.2%Period 1 of 2026-27: 88.2%Period 2 of 2026-27: 88.4%Period 3 of 2026-27: 84.5%Period 4 of 2026-27: 82.0%Period 5 of 2026-27: 88.6%Period 6 of 2026-27: 85.8%Period 7 of 2026-27: 85.7%
This pageGreat Britain
0%2%4%6%Period 1 of 2023-24: 1.8%Period 2 of 2023-24: 0.9%Period 3 of 2023-24: 3.6%Period 4 of 2023-24: 2.3%Period 6 of 2023-24: 1.8%Period 7 of 2023-24: 4.0%Period 8 of 2023-24: 2.6%Period 9 of 2023-24: 5.5%Period 10 of 2023-24: 1.8%Period 11 of 2023-24: 3.3%Period 12 of 2023-24: 2.3%Period 13 of 2023-24: 3.8%Period 1 of 2024-25: 4.3%Period 2 of 2024-25: 1.3%Period 3 of 2024-25: 2.8%Period 4 of 2024-25: 1.6%Period 5 of 2024-25: 2.1%Period 6 of 2024-25: 0.9%Period 7 of 2024-25: 2.6%Period 8 of 2024-25: 3.7%Period 9 of 2024-25: 1.6%Period 10 of 2024-25: 3.2%Period 11 of 2024-25: 3.2%Period 12 of 2024-25: 1.4%Period 13 of 2024-25: 1.2%Period 1 of 2025-26: 2.0%Period 2 of 2025-26: 1.3%Period 3 of 2025-26: 1.4%Period 4 of 2025-26: 2.6%Period 5 of 2025-26: 1.5%Period 6 of 2025-26: 1.9%Period 7 of 2025-26: 1.8%Period 8 of 2025-26: 3.5%Period 9 of 2025-26: 4.3%Period 10 of 2025-26: 2.9%Period 11 of 2025-26: 3.1%Period 12 of 2025-26: 2.8%Period 13 of 2025-26: 1.5%Period 1 of 2026-27: 2.5%Period 2 of 2026-27: 4.0%Period 3 of 2026-27: 2.7%Period 4 of 2026-27: 3.4%Period 5 of 2026-27: 5.1%Period 6 of 2026-27: 5.7%Period 7 of 2026-27: 2.3%2023-242024-252025-262026-27

Operators calling here

OperatorScheduled stopsWithin 3 minCancelled
London Overground51,43187.0%3.3%

Operators with their own page for this station are linked to it.

The last 13 periods

PeriodScheduled stopsWithin 3 minCancelled
Period 7 of 2026-273,98685.7%2.3%
Period 6 of 2026-273,87985.8%5.7%
Period 5 of 2026-273,76988.6%5.1%
Period 4 of 2026-274,05182.0%3.4%
Period 3 of 2026-273,93084.5%2.7%
Period 2 of 2026-273,90188.4%4.0%
Period 1 of 2026-274,07488.2%2.5%
Period 13 of 2025-264,35689.2%1.5%
Period 12 of 2025-263,90787.4%2.8%
Period 11 of 2025-264,03286.9%3.1%
Period 10 of 2025-263,73486.5%2.9%
Period 9 of 2025-263,76486.3%4.3%
Period 8 of 2025-264,04891.0%3.5%

Time of year

75%80%85%90%95%P1: 90.6%1P2: 90.9%2P3: 88.7%3P4: 87.6%4P5: 89.1%5P6: 89.3%6P7: 89.4%7P8: 91.3%8P9: 87.7%9P10: 89.6%10P11: 90.2%11P12: 90.1%12P13: 91.1%13

Each point averages that period of the railway year over every year in the data. Period 1 starts in April.

Similar stations in London

StationScheduled stopsWithin 3 minCancelled
Harlesden51,43192.3%2.9%
Headstone Lane51,43187.4%3.3%
Kenton51,43186.5%2.9%

On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out