Horsham
HRHSouth EastManaged by Govia Thameslink Railway (Southern)
How this station is performing
Horsham had 77,338 scheduled stops to Period 7 of 2026-27, about 212 a day. 72.6% of recorded arrivals were within three minutes of the timetable and 3.8% of scheduled stops were cancelled.
Horsham opened on 14 February 1848. It was moved to the site it uses now on 10 October 1859. Of the 5 stations nearest to it with a known opening date, Horsham is the oldest; the next oldest, Faygate, dates from 1848.
The nearest stations to Horsham are Littlehaven (1.7 km north-east), Warnham (3.1 km north), Christs Hospital (3.6 km south-west), Faygate (5.1 km north-east) and Ifield (9.1 km north-east). 6 stations lie within 10 km in all. At 72.6%, Horsham is less punctual than all of them; the best of the five, Ifield, manages 80.9%.
Horsham is one of 2 stations named after a market town called Horsham, home to about 50,934 people; this one stands 0.6 km from its centre.
For Horsham, the weakest four-week period in the data is a recent one: Period 6 of 2026-27, when only 50.3% of stops arrived within three minutes of the timetable. The strongest was Period 1 of 2023-24, at 86.2%, which is 35.9 percentage points higher.
Compared with 3 stations of a similar size in South East, Horsham is the least punctual, at 72.6%. All of them are ahead, including Epsom (Surrey) (86.7%), Burgess Hill (76.5%) and Portsmouth Harbour (73.0%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| GTR | 77,338 | 72.6% | 3.8% |
Operators with their own page for this station are linked to it.
Late train at Horsham? Delay Repay
These operators call at Horsham and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 6,171 | 63.4% | 3.0% |
| Period 6 of 2026-27 | 4,825 | 50.3% | 4.4% |
| Period 5 of 2026-27 | 5,964 | 62.0% | 7.3% |
| Period 4 of 2026-27 | 6,061 | 72.2% | 4.2% |
| Period 3 of 2026-27 | 5,968 | 73.2% | 5.4% |
| Period 2 of 2026-27 | 5,882 | 77.5% | 4.5% |
| Period 1 of 2026-27 | 7,036 | 82.9% | 3.0% |
| Period 13 of 2025-26 | 6,681 | 82.3% | 2.2% |
| Period 12 of 2025-26 | 5,639 | 76.3% | 2.3% |
| Period 11 of 2025-26 | 5,735 | 76.4% | 3.2% |
| Period 10 of 2025-26 | 5,258 | 75.1% | 3.3% |
| Period 9 of 2025-26 | 6,117 | 69.3% | 4.1% |
| Period 8 of 2025-26 | 6,001 | 76.1% | 2.9% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South East
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Epsom (Surrey) | 77,622 | 86.7% | 2.8% |
| Burgess Hill | 76,996 | 76.5% | 6.6% |
| Portsmouth Harbour | 75,400 | 73.0% | 7.9% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out