Epsom (Surrey)
EPSSouth EastManaged by Govia Thameslink Railway (Southern)
How this station is performing
Epsom (Surrey) had 77,622 scheduled stops to Period 7 of 2026-27, about 213 a day. 86.7% of recorded arrivals were within three minutes of the timetable and 2.8% of scheduled stops were cancelled.
Epsom (Surrey) opened on 1 February 1859, 167 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Ewell East is the oldest (1847) and Tattenham Corner the newest (1901), with Epsom (Surrey) in between.
The nearest stations to Epsom (Surrey) are Ewell West (2.0 km north-east), Ewell East (2.3 km north-east), Epsom Downs (2.4 km south-east), Ashtead (3.2 km south-west) and Tattenham Corner (3.4 km south-east). 51 stations lie within 10 km in all. Of the five, Epsom Downs is the most punctual at 92.6% and Ewell West the least at 83.0%, with Epsom (Surrey) on 86.7%.
Epsom (Surrey) is named after Epsom, a town, home to about 31,489 people, but the station stands 0.2 km from its centre.
2 operators call at Epsom (Surrey): GTR (90.8%, 63% of stops) and South Western Railway (79.8%, 37% of stops). The operator you travel with matters: GTR reaches 90.8% within three minutes while South Western Railway manages 79.8%, a gap of 11.0 percentage points.
Compared with 3 stations of a similar size in South East, Epsom (Surrey) is the most punctual, at 86.7%. The comparison group includes Horsham (72.6%), Burgess Hill (76.5%) and Portsmouth Harbour (73.0%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| GTR | 48,748 | 90.8% | 2.6% |
| South Western Railway | 28,874 | 79.8% | 3.1% |
Operators with their own page for this station are linked to it.
Late train at Epsom (Surrey)? Delay Repay
These operators call at Epsom (Surrey) and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 5,959 | 88.7% | 3.8% |
| Period 6 of 2026-27 | 5,970 | 88.4% | 2.2% |
| Period 5 of 2026-27 | 5,924 | 88.2% | 2.7% |
| Period 4 of 2026-27 | 6,006 | 89.1% | 1.7% |
| Period 3 of 2026-27 | 5,832 | 87.3% | 2.9% |
| Period 2 of 2026-27 | 5,915 | 85.8% | 3.4% |
| Period 1 of 2026-27 | 6,620 | 88.7% | 2.8% |
| Period 13 of 2025-26 | 6,619 | 89.4% | 3.2% |
| Period 12 of 2025-26 | 5,849 | 85.1% | 3.5% |
| Period 11 of 2025-26 | 5,734 | 84.3% | 1.6% |
| Period 10 of 2025-26 | 5,139 | 85.9% | 2.7% |
| Period 9 of 2025-26 | 6,031 | 81.1% | 2.1% |
| Period 8 of 2025-26 | 6,024 | 84.3% | 3.6% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South East
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Horsham | 77,338 | 72.6% | 3.8% |
| Burgess Hill | 76,996 | 76.5% | 6.6% |
| Portsmouth Harbour | 75,400 | 73.0% | 7.9% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out