West Midlands Railway at Stafford
All trains at StaffordWest Midlands Railway across BritainWest Midlands
How this operator is doing here
West Midlands Railway had 44,628 scheduled stops at Stafford in the 13 periods to Period 7 of 2026-27, 45% of the station's total. 59.6% of recorded arrivals came within three minutes and 4.0% of stops were cancelled.
West Midlands Railway trains at Stafford also serve Penkridge (8.9 km south, 57.1% on time, 3.3% cancelled), Stone (Staffs) (11.8 km north, 67.0% on time, 4.2% cancelled), Hednesford (13.2 km south-east, 92.6% on time, 3.1% cancelled), Rugeley Trent Valley (13.5 km east, 77.6% on time, 4.7% cancelled), Rugeley Town (13.6 km south-east, 94.3% on time, 3.6% cancelled) and Cannock (14.7 km south-east, 94.0% on time, 2.6% cancelled), which are the stations on its network closest to Stafford.
Within 30 km of here, West Midlands Railway runs best at Rugeley Town, 13.6 km south-east (94.3%), and worst at Penkridge, 8.9 km south (57.1%).
The busiest West Midlands Railway station within 30 km of Stafford is Wolverhampton, 24.0 km south, with about 183 scheduled stops a day.
West Midlands Railway at Stafford has slipped sharply. 59.6% of stops came within three minutes of the timetable in the latest 13 periods, 7.8 percentage points worse than the 67.4% recorded in the 13 before. Cancellations held steady at 4.0% of scheduled stops, against 3.6% before.
Period by period
See how West Midlands Railway Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 3,361 | 59.1% | 2.0% |
| Period 6 of 2026-27 | 3,452 | 55.0% | 3.2% |
| Period 5 of 2026-27 | 3,452 | 56.0% | 3.3% |
| Period 4 of 2026-27 | 3,290 | 50.1% | 8.0% |
| Period 3 of 2026-27 | 3,333 | 58.0% | 3.9% |
| Period 2 of 2026-27 | 3,244 | 59.3% | 4.3% |
| Period 1 of 2026-27 | 3,962 | 69.3% | 1.5% |
| Period 13 of 2025-26 | 3,707 | 64.4% | 4.3% |
| Period 12 of 2025-26 | 3,444 | 63.5% | 1.9% |
| Period 11 of 2025-26 | 3,411 | 63.9% | 6.2% |
| Period 10 of 2025-26 | 3,086 | 61.0% | 3.4% |
| Period 9 of 2025-26 | 3,442 | 52.3% | 6.9% |
| Period 8 of 2025-26 | 3,444 | 60.5% | 3.5% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Stafford
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Avanti | 33,455 | 56.3% | 4.4% |
| CrossCountry | 21,262 | 59.1% | 4.9% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out