CrossCountry at Stafford
All trains at StaffordCrossCountry across BritainWest Midlands
How this operator is doing here
CrossCountry had 21,262 scheduled stops at Stafford in the 13 periods to Period 7 of 2026-27, 21% of the station's total. 59.1% of recorded arrivals came within three minutes and 4.9% of stops were cancelled.
CrossCountry trains at Stafford also serve Penkridge (8.9 km south, – on time, – cancelled), Stoke-on-Trent (23.1 km north, 59.4% on time, 5.8% cancelled), Wolverhampton (24.0 km south, 55.7% on time, 5.6% cancelled), Burton-on-Trent (32.3 km east, 68.9% on time, 5.5% cancelled), Tamworth (34.7 km south-east, 68.2% on time, 5.6% cancelled) and Wilnecote (Staffs) (36.8 km south-east, 74.1% on time, 6.4% cancelled), which are the stations on its network closest to Stafford.
The busiest CrossCountry station within 30 km of Stafford is Wolverhampton, 24.0 km south, with about 58 scheduled stops a day.
CrossCountry ranks 2nd of the 3 operators with enough records at Stafford, on 59.1%.
CrossCountry at Stafford has slipped sharply. 59.1% of stops came within three minutes of the timetable in the latest 13 periods, 6.2 percentage points worse than the 65.3% recorded in the 13 before. Cancellations rose to 4.9% of scheduled stops from 3.8%, which is 1.1 percentage points more.
Over three full railway years CrossCountry at Stafford has got worse each time, from 68.7% within three minutes in 2023-24 to 66.2% in 2024-25 and 63.9% in 2025-26.
Period by period
See how CrossCountry Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,616 | 56.2% | 3.5% |
| Period 6 of 2026-27 | 1,599 | 54.2% | 5.6% |
| Period 5 of 2026-27 | 1,634 | 54.5% | 4.6% |
| Period 4 of 2026-27 | 1,632 | 47.0% | 4.7% |
| Period 3 of 2026-27 | 1,607 | 59.3% | 3.9% |
| Period 2 of 2026-27 | 1,579 | 57.7% | 4.4% |
| Period 1 of 2026-27 | 1,882 | 66.3% | 3.9% |
| Period 13 of 2025-26 | 1,799 | 68.1% | 9.8% |
| Period 12 of 2025-26 | 1,636 | 69.3% | 4.8% |
| Period 11 of 2025-26 | 1,616 | 66.9% | 5.7% |
| Period 10 of 2025-26 | 1,437 | 63.0% | 5.0% |
| Period 9 of 2025-26 | 1,636 | 46.2% | 5.8% |
| Period 8 of 2025-26 | 1,589 | 59.0% | 1.6% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Stafford
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| West Midlands Railway | 44,628 | 59.6% | 4.0% |
| Avanti | 33,455 | 56.3% | 4.4% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out