Avanti at Stafford
How this operator is doing here
Avanti had 33,455 scheduled stops at Stafford in the 13 periods to Period 7 of 2026-27, 34% of the station's total. 56.3% of recorded arrivals came within three minutes and 4.4% of stops were cancelled.
Avanti trains at Stafford also serve Rugeley Trent Valley (13.5 km east, – on time, – cancelled), Stoke-on-Trent (23.1 km north, 49.6% on time, 7.2% cancelled), Wolverhampton (24.0 km south, 62.1% on time, 6.2% cancelled), Lichfield Trent Valley (25.3 km south-east, 45.5% on time, 8.1% cancelled), Sandwell and Dudley (33.7 km south, 59.4% on time, 7.3% cancelled) and Tamworth (34.7 km south-east, 45.6% on time, 8.2% cancelled), which are the stations on its network closest to Stafford.
Within 30 km of here, Avanti runs best at Wolverhampton, 24.0 km south (62.1%), and worst at Lichfield Trent Valley, 25.3 km south-east (45.5%).
The busiest Avanti station within 30 km of Stafford is Stoke-on-Trent, 23.1 km north, with about 58 scheduled stops a day.
Of the 3 operators with enough records at Stafford, Avanti is the least punctual, at 56.3%.
Over three full railway years Avanti at Stafford has got worse each time, from 65.8% within three minutes in 2023-24 to 60.6% in 2024-25 and 58.3% in 2025-26.
Period by period
See how Avanti Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 2,621 | 59.4% | 2.4% |
| Period 6 of 2026-27 | 2,575 | 48.8% | 0.7% |
| Period 5 of 2026-27 | 2,538 | 51.9% | 7.2% |
| Period 4 of 2026-27 | 2,520 | 44.0% | 10.2% |
| Period 3 of 2026-27 | 2,600 | 54.4% | 3.3% |
| Period 2 of 2026-27 | 2,509 | 56.5% | 5.6% |
| Period 1 of 2026-27 | 2,738 | 65.9% | 4.6% |
| Period 13 of 2025-26 | 2,854 | 67.6% | 2.9% |
| Period 12 of 2025-26 | 2,610 | 61.3% | 2.2% |
| Period 11 of 2025-26 | 2,530 | 61.1% | 4.4% |
| Period 10 of 2025-26 | 2,136 | 60.0% | 4.8% |
| Period 9 of 2025-26 | 2,593 | 44.3% | 6.2% |
| Period 8 of 2025-26 | 2,631 | 54.4% | 3.2% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Stafford
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| West Midlands Railway | 44,628 | 59.6% | 4.0% |
| CrossCountry | 21,262 | 59.1% | 4.9% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out