Skip to content

How punctual is your station? Every stop, every operator, every four weeks.

Springfield

SPFScotlandManaged by ScotRail

On time, last 13 periods83.3%Great Britain: 83.6%
Cancelled0.9%Great Britain: 3.2%
Stops a day4Scheduled, on average
Punctuality rank1238th of 2,374Among ranked stations

How this station is performing

Springfield had 1,535 scheduled stops to Period 7 of 2026-27, about 4 a day. 83.3% of recorded arrivals were within three minutes of the timetable and 0.9% of scheduled stops were cancelled.

Springfield opened on 20 September 1847, 179 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Springfield is the oldest; the next oldest, Cupar, dates from 1847.

The nearest stations to Springfield are Cupar (3.7 km north-east), Ladybank (4.8 km south-west), Markinch (11.6 km south-west), Cameron Bridge (11.7 km south) and Leven (11.8 km south). 2 stations lie within 10 km in all. Of the five, Leven is the most punctual at 83.4% and Cupar the least at 76.1%, with Springfield on 83.3%.

Springfield is one of 7 stations named after a Village called Springfield, home to about 960 people; this one stands 0.5 km from its centre.

Across the whole run of data, the weakest four-week period for Springfield was Period 5 of 2024-25, at 52.6%, some time before the latest year. The strongest was Period 7 of 2025-26, at 92.9%, and the two are 40.3 percentage points apart. Cancellations peaked at 10.2% of scheduled stops in Period 8 of 2023-24, against 0.9% over the latest 13 periods.

Compared with 3 stations of a similar size in Scotland, Springfield is the most punctual, at 83.3%. The comparison group includes Bridge of Orchy (67.5%), Rannoch (70.3%) and Spean Bridge (77.5%).

Period by period

60%80%2023-242024-252025-262026-27Period 1 of 2023-24: 92.7%Period 2 of 2023-24: 90.5%Period 3 of 2023-24: 80.3%Period 4 of 2023-24: 90.7%Period 5 of 2023-24: 79.5%Period 6 of 2023-24: 78.1%Period 7 of 2023-24: 78.1%Period 8 of 2023-24: 66.0%Period 9 of 2023-24: 71.4%Period 10 of 2023-24: 74.5%Period 11 of 2023-24: 85.3%Period 12 of 2023-24: 81.7%Period 13 of 2023-24: 89.1%Period 1 of 2024-25: 86.3%Period 2 of 2024-25: 82.4%Period 3 of 2024-25: 76.5%Period 4 of 2024-25: 79.4%Period 5 of 2024-25: 52.6%Period 6 of 2024-25: 73.7%Period 7 of 2024-25: 75.2%Period 8 of 2024-25: 62.5%Period 9 of 2024-25: 68.3%Period 10 of 2024-25: 76.2%Period 11 of 2024-25: 85.5%Period 12 of 2024-25: 91.5%Period 13 of 2024-25: 92.8%Period 1 of 2025-26: 91.2%Period 2 of 2025-26: 86.6%Period 3 of 2025-26: 86.7%Period 4 of 2025-26: 85.0%Period 5 of 2025-26: 88.5%Period 6 of 2025-26: 92.3%Period 7 of 2025-26: 92.9%Period 8 of 2025-26: 89.1%Period 9 of 2025-26: 77.6%Period 10 of 2025-26: 76.2%Period 11 of 2025-26: 83.1%Period 12 of 2025-26: 84.2%Period 13 of 2025-26: 89.1%Period 1 of 2026-27: 85.6%Period 2 of 2026-27: 84.2%Period 3 of 2026-27: 87.1%Period 4 of 2026-27: 87.4%Period 5 of 2026-27: 78.0%Period 6 of 2026-27: 79.8%Period 7 of 2026-27: 79.2%
This pageGreat Britain
0%5%10%15%Period 1 of 2023-24: 0.8%Period 2 of 2023-24: 1.7%Period 3 of 2023-24: 2.5%Period 4 of 2023-24: 1.7%Period 5 of 2023-24: 0.8%Period 6 of 2023-24: 3.4%Period 7 of 2023-24: 4.2%Period 8 of 2023-24: 10.2%Period 9 of 2023-24: 0.8%Period 10 of 2023-24: 4.1%Period 11 of 2023-24: 0.9%Period 12 of 2023-24: 0.0%Period 13 of 2023-24: 0.8%Period 1 of 2024-25: 2.5%Period 2 of 2024-25: 0.8%Period 3 of 2024-25: 0.8%Period 4 of 2024-25: 1.9%Period 5 of 2024-25: 1.0%Period 6 of 2024-25: 1.0%Period 7 of 2024-25: 1.0%Period 8 of 2024-25: 0.0%Period 9 of 2024-25: 0.0%Period 10 of 2024-25: 0.0%Period 11 of 2024-25: 0.0%Period 12 of 2024-25: 1.7%Period 13 of 2024-25: 0.0%Period 1 of 2025-26: 0.9%Period 2 of 2025-26: 0.8%Period 3 of 2025-26: 0.0%Period 4 of 2025-26: 0.0%Period 5 of 2025-26: 2.6%Period 6 of 2025-26: 2.5%Period 7 of 2025-26: 0.9%Period 8 of 2025-26: 0.0%Period 9 of 2025-26: 3.3%Period 10 of 2025-26: 0.0%Period 11 of 2025-26: 2.4%Period 12 of 2025-26: 0.0%Period 13 of 2025-26: 1.5%Period 1 of 2026-27: 0.7%Period 2 of 2026-27: 0.0%Period 3 of 2026-27: 1.7%Period 4 of 2026-27: 0.0%Period 5 of 2026-27: 1.7%Period 6 of 2026-27: 0.8%Period 7 of 2026-27: 0.0%2023-242024-252025-262026-27

Operators calling here

OperatorScheduled stopsWithin 3 minCancelled
ScotRail1,53583.3%0.9%

Operators with their own page for this station are linked to it.

Late train at Springfield? Delay Repay

These operators call at Springfield and publish Delay Repay rules.

The last 13 periods

PeriodScheduled stopsWithin 3 minCancelled
Period 7 of 2026-2712079.2%0.0%
Period 6 of 2026-2712079.8%0.8%
Period 5 of 2026-2712078.0%1.7%
Period 4 of 2026-2712087.4%0.0%
Period 3 of 2026-2712087.1%1.7%
Period 2 of 2026-2712084.2%0.0%
Period 1 of 2026-2714085.6%0.7%
Period 13 of 2025-2613089.1%1.5%
Period 12 of 2025-2612084.2%0.0%
Period 11 of 2025-268583.1%2.4%
Period 10 of 2025-2610176.2%0.0%
Period 9 of 2025-2612077.6%3.3%
Period 8 of 2025-2611989.1%0.0%

Time of year

70%80%90%P1: 88.8%1P2: 85.9%2P3: 82.6%3P4: 85.8%4P5: 75.6%5P6: 81.3%6P7: 81.4%7P8: 72.9%8P9: 72.4%9P10: 75.7%10P11: 84.8%11P12: 85.8%12P13: 90.3%13

Each point averages that period of the railway year over every year in the data. Period 1 starts in April.

Similar stations in Scotland

StationScheduled stopsWithin 3 minCancelled
Bridge of Orchy2,31867.5%0.7%
Rannoch2,31870.3%0.7%
Spean Bridge2,31877.5%0.7%

On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out