South Kenton
SOKLondonManaged by London Underground
How this station is performing
South Kenton had 51,431 scheduled stops to Period 7 of 2026-27, about 141 a day. 88.1% of recorded arrivals were within three minutes of the timetable and 2.9% of scheduled stops were cancelled.
South Kenton opened on 3 July 1933, 93 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, South Kenton is the newest; the oldest, Wembley Central, opened in 1842.
The nearest stations to South Kenton are North Wembley (0.9 km south), Kenton (1.4 km north-west), Sudbury and Harrow Road (1.8 km south), Wembley Central (2.1 km south) and Harrow-on-the-Hill (2.2 km north-west). 49 stations lie within 10 km in all. Of the five, Sudbury and Harrow Road is the most punctual at 89.8% and Kenton the least at 86.5%, with South Kenton on 88.1%.
South Kenton takes its name from an area of London called South Kenton, and the station stands 0.1 km from its centre.
South Kenton has slipped a little, from 91.7% within three minutes in the previous 13 periods to 88.1% in the latest 13, a fall of 3.6 percentage points. Cancellations rose to 2.9% of scheduled stops from 1.9%, which is 1.0 percentage points more.
1 of 3 stations of a similar size in London are more punctual than South Kenton on 88.1%. The comparison group includes Harlesden (92.3%), Hatch End (87.0%) and Headstone Lane (87.4%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| London Overground | 51,431 | 88.1% | 2.9% |
Operators with their own page for this station are linked to it.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 3,986 | 87.2% | 1.6% |
| Period 6 of 2026-27 | 3,879 | 86.8% | 5.0% |
| Period 5 of 2026-27 | 3,769 | 89.9% | 4.9% |
| Period 4 of 2026-27 | 4,051 | 83.6% | 2.7% |
| Period 3 of 2026-27 | 3,930 | 86.6% | 2.3% |
| Period 2 of 2026-27 | 3,901 | 89.5% | 3.7% |
| Period 1 of 2026-27 | 4,074 | 88.7% | 1.8% |
| Period 13 of 2025-26 | 4,356 | 90.4% | 1.3% |
| Period 12 of 2025-26 | 3,907 | 88.0% | 2.5% |
| Period 11 of 2025-26 | 4,032 | 88.3% | 2.8% |
| Period 10 of 2025-26 | 3,734 | 88.1% | 2.7% |
| Period 9 of 2025-26 | 3,764 | 87.0% | 4.0% |
| Period 8 of 2025-26 | 4,048 | 91.3% | 3.0% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in London
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Harlesden | 51,431 | 92.3% | 2.9% |
| Hatch End | 51,431 | 87.0% | 3.3% |
| Headstone Lane | 51,431 | 87.4% | 3.3% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out