Skip to content

How punctual is your station? Every stop, every operator, every four weeks.

Heighington

HEINorth EastManaged by Northern Trains

On time, last 13 periods87.4%Great Britain: 83.6%
Cancelled2.1%Great Britain: 3.2%
Stops a day31Scheduled, on average
Punctuality rank823rd of 2,374Among ranked stations

How this station is performing

Heighington had 11,247 scheduled stops to Period 7 of 2026-27, about 31 a day. 87.4% of recorded arrivals were within three minutes of the timetable and 2.1% of scheduled stops were cancelled.

The nearest stations to Heighington are Newton Aycliffe (1.9 km north), Shildon (4.8 km north-west), North Road (Darlington) (7.0 km south), Darlington (8.8 km south) and Bishop Auckland (9.1 km north-west). 5 stations lie within 10 km in all. Of the five, North Road (Darlington) is the most punctual at 88.8% and Darlington the least at 74.7%, with Heighington on 87.4%.

Heighington is one of 2 stations named after a Village called Heighington, home to about 2,771 people; this one stands 2.3 km from its centre.

Heighington has edged up: 87.4% of stops came within three minutes of the timetable in the latest 13 periods, 3.7 percentage points better than the 83.7% of the 13 before. Cancellations fell to 2.1% of scheduled stops from 4.1%, which is 2.0 percentage points fewer.

The time of year matters a great deal for Heighington. Averaged over every railway year in the data, period 5 (late July and August) is the weakest at 78.9%, while period 13 (March) is the strongest at 90.1%, a spread of 11.2 percentage points.

2 of 3 stations of a similar size in North East are more punctual than Heighington on 87.4%. The comparison group includes Newton Aycliffe (88.0%), North Road (Darlington) (88.8%) and Shildon (86.3%).

Period by period

70%80%90%2023-242024-252025-262026-27Period 8 of 2024-25: 83.7%Period 9 of 2024-25: 78.2%Period 10 of 2024-25: 79.8%Period 11 of 2024-25: 86.3%Period 12 of 2024-25: 83.4%Period 13 of 2024-25: 91.0%Period 1 of 2025-26: 87.8%Period 2 of 2025-26: 88.4%Period 3 of 2025-26: 85.5%Period 4 of 2025-26: 82.4%Period 5 of 2025-26: 75.9%Period 6 of 2025-26: 79.7%Period 7 of 2025-26: 85.2%Period 8 of 2025-26: 80.7%Period 9 of 2025-26: 81.1%Period 10 of 2025-26: 86.3%Period 11 of 2025-26: 91.3%Period 12 of 2025-26: 89.9%Period 13 of 2025-26: 89.4%Period 1 of 2026-27: 86.1%Period 2 of 2026-27: 86.5%Period 3 of 2026-27: 90.6%Period 4 of 2026-27: 89.2%Period 5 of 2026-27: 81.7%Period 6 of 2026-27: 91.3%Period 7 of 2026-27: 90.4%
This pageGreat Britain
0%5%10%15%Period 1 of 2023-24: 3.6%Period 2 of 2023-24: 4.8%Period 3 of 2023-24: 6.1%Period 4 of 2023-24: 2.4%Period 5 of 2023-24: 3.5%Period 6 of 2023-24: 4.2%Period 7 of 2023-24: 2.7%Period 8 of 2023-24: 8.1%Period 9 of 2023-24: 4.7%Period 10 of 2023-24: 4.4%Period 11 of 2023-24: 1.6%Period 12 of 2023-24: 2.8%Period 13 of 2023-24: 2.3%Period 1 of 2024-25: 2.3%Period 2 of 2024-25: 3.0%Period 3 of 2024-25: 3.6%Period 4 of 2024-25: 7.6%Period 5 of 2024-25: 3.2%Period 6 of 2024-25: 6.2%Period 7 of 2024-25: 11.7%Period 8 of 2024-25: 6.7%Period 9 of 2024-25: 6.3%Period 10 of 2024-25: 7.6%Period 11 of 2024-25: 5.1%Period 12 of 2024-25: 2.9%Period 13 of 2024-25: 5.6%Period 1 of 2025-26: 3.8%Period 2 of 2025-26: 1.5%Period 3 of 2025-26: 1.9%Period 4 of 2025-26: 2.3%Period 5 of 2025-26: 4.6%Period 6 of 2025-26: 2.4%Period 7 of 2025-26: 3.0%Period 8 of 2025-26: 2.6%Period 9 of 2025-26: 3.0%Period 10 of 2025-26: 5.1%Period 11 of 2025-26: 1.4%Period 12 of 2025-26: 1.6%Period 13 of 2025-26: 2.0%Period 1 of 2026-27: 1.5%Period 2 of 2026-27: 2.1%Period 3 of 2026-27: 0.9%Period 4 of 2026-27: 1.7%Period 5 of 2026-27: 2.5%Period 6 of 2026-27: 2.9%Period 7 of 2026-27: 0.8%2023-242024-252025-262026-27

Operators calling here

OperatorScheduled stopsWithin 3 minCancelled
Northern11,24787.4%2.1%

Operators with their own page for this station are linked to it.

The last 13 periods

PeriodScheduled stopsWithin 3 minCancelled
Period 7 of 2026-2788090.4%0.8%
Period 6 of 2026-2788291.3%2.9%
Period 5 of 2026-2788081.7%2.5%
Period 4 of 2026-2788089.2%1.7%
Period 3 of 2026-2788090.6%0.9%
Period 2 of 2026-2787186.5%2.1%
Period 1 of 2026-271,00886.1%1.5%
Period 13 of 2025-2691289.4%2.0%
Period 12 of 2025-2688089.9%1.6%
Period 11 of 2025-2688091.3%1.4%
Period 10 of 2025-2675886.3%5.1%
Period 9 of 2025-2673881.1%3.0%
Period 8 of 2025-2679880.7%2.6%

Time of year

75%80%85%90%95%P1: 87.0%1P2: 87.5%2P3: 88.1%3P4: 86.0%4P5: 78.9%5P6: 85.6%6P7: 88.0%7P8: 82.2%8P9: 79.6%9P10: 83.7%10P11: 88.9%11P12: 87.1%12P13: 90.1%13

Each point averages that period of the railway year over every year in the data. Period 1 starts in April.

Similar stations in North East

StationScheduled stopsWithin 3 minCancelled
Newton Aycliffe11,24788.0%2.1%
North Road (Darlington)11,24788.8%2.1%
Shildon11,24786.3%2.2%

On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out