Sholing
SHOSouth EastManaged by South Western Railway
How this station is performing
Sholing had 12,952 scheduled stops to Period 7 of 2026-27, about 36 a day. 77.8% of recorded arrivals were within three minutes of the timetable and 1.6% of scheduled stops were cancelled.
Sholing opened on 1 August 1866, 160 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Sholing is the newest; the oldest, Southampton Central, opened in 1847.
The nearest stations to Sholing are Woolston (0.9 km west), Bitterne (2.5 km north), Netley (2.9 km south-east), St Denys (3.3 km north-west) and Southampton Central (3.7 km west). 17 stations lie within 10 km in all. Of the five, Woolston is the most punctual at 80.7% and Southampton Central the least at 69.4%, with Sholing on 77.8%.
Sholing takes its name from a suburb called Sholing, home to about 14,053 people, and the station stands 0.8 km from its centre.
Sholing has slipped sharply. 77.8% of stops came within three minutes of the timetable in the latest 13 periods, 9.1 percentage points worse than the 86.9% recorded in the 13 before. Cancellations held steady at 1.6% of scheduled stops, against 1.2% before.
Compared with 3 stations of a similar size in South East, Sholing is the most punctual, at 77.8%. The comparison group includes Plumpton (67.8%), Bitterne (77.5%) and Redbridge (75.1%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| South Western Railway | 12,950 | 77.8% | 1.6% |
| GTR | 2 | – | – |
Operators with their own page for this station are linked to it.
Late train at Sholing? Delay Repay
These operators call at Sholing and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 999 | 61.5% | 1.7% |
| Period 6 of 2026-27 | 929 | 51.4% | 1.2% |
| Period 5 of 2026-27 | 1,000 | 74.1% | 1.2% |
| Period 4 of 2026-27 | 965 | 75.1% | 0.6% |
| Period 3 of 2026-27 | 997 | 77.4% | 2.9% |
| Period 2 of 2026-27 | 1,006 | 77.6% | 3.6% |
| Period 1 of 2026-27 | 1,147 | 85.3% | 1.2% |
| Period 13 of 2025-26 | 1,096 | 89.2% | 0.4% |
| Period 12 of 2025-26 | 931 | 86.7% | 1.8% |
| Period 11 of 2025-26 | 997 | 88.4% | 1.7% |
| Period 10 of 2025-26 | 888 | 84.3% | 1.7% |
| Period 9 of 2025-26 | 997 | 77.5% | 1.0% |
| Period 8 of 2025-26 | 1,000 | 80.4% | 2.4% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South East
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out