How this station is performing
Plumpton had 12,885 scheduled stops to Period 7 of 2026-27, about 35 a day. 67.8% of recorded arrivals were within three minutes of the timetable and 2.2% of scheduled stops were cancelled.
The nearest stations to Plumpton are Cooksbridge (4.5 km south-east), Burgess Hill (5.5 km north-west), Wivelsfield (5.8 km north-west), Hassocks (6.0 km west) and Falmer (7.6 km south). 7 stations lie within 10 km in all. Of the five, Falmer is the most punctual at 89.1% and Cooksbridge the least at 66.1%, with Plumpton on 67.8%.
Plumpton is one of 5 stations named after a Village called Plumpton, home to about 1,659 people; this one stands 3.2 km from its centre.
Plumpton has slipped sharply. 67.8% of stops came within three minutes of the timetable in the latest 13 periods, 7.1 percentage points worse than the 74.9% recorded in the 13 before. Cancellations rose to 2.2% of scheduled stops from 1.5%, which is 0.7 percentage points more.
For Plumpton, the weakest four-week period in the data is a recent one: Period 6 of 2026-27, when only 14.6% of stops arrived within three minutes of the timetable. The strongest was Period 1 of 2025-26, at 85.9%, which is 71.3 percentage points higher. Cancellations peaked at 5.4% of scheduled stops in Period 5 of 2026-27, against 2.2% over the latest 13 periods.
Compared with 3 stations of a similar size in South East, Plumpton is the least punctual, at 67.8%. All of them are ahead, including Bitterne (77.5%), Sholing (77.8%) and Little Kimble (94.5%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| GTR | 12,885 | 67.8% | 2.2% |
Operators with their own page for this station are linked to it.
Late train at Plumpton? Delay Repay
These operators call at Plumpton and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 951 | 57.0% | 3.8% |
| Period 6 of 2026-27 | 713 | 14.6% | 1.8% |
| Period 5 of 2026-27 | 705 | 56.5% | 5.4% |
| Period 4 of 2026-27 | 1,064 | 70.4% | 1.3% |
| Period 3 of 2026-27 | 1,049 | 67.8% | 5.1% |
| Period 2 of 2026-27 | 1,029 | 75.2% | 3.0% |
| Period 1 of 2026-27 | 1,212 | 78.4% | 2.0% |
| Period 13 of 2025-26 | 1,085 | 83.1% | 1.4% |
| Period 12 of 2025-26 | 1,039 | 73.3% | 0.3% |
| Period 11 of 2025-26 | 1,077 | 74.3% | 0.6% |
| Period 10 of 2025-26 | 906 | 72.6% | 1.0% |
| Period 9 of 2025-26 | 1,014 | 65.7% | 2.2% |
| Period 8 of 2025-26 | 1,041 | 68.0% | 2.3% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South East
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Bitterne | 12,857 | 77.5% | 1.5% |
| Sholing | 12,952 | 77.8% | 1.6% |
| Little Kimble | 12,733 | 94.5% | 1.0% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out