Redbridge had 13,144 scheduled stops to Period 7 of 2026-27, about 36 a day. 75.1% of recorded arrivals were within three minutes of the timetable and 2.1% of scheduled stops were cancelled.
Redbridge opened on 1 June 1847, 179 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Redbridge is the oldest; the next oldest, Southampton Central, dates from 1847.
The nearest stations to Redbridge are Totton (1.0 km west), Millbrook (Hants) (2.7 km east), Southampton Central (4.1 km east), Ashurst New Forest (5.2 km south-west) and St Denys (5.7 km east). 14 stations lie within 10 km in all. Of the five, Millbrook (Hants) is the most punctual at 79.1% and Totton the least at 68.7%, with Redbridge on 75.1%.
Redbridge is one of 3 stations named after a suburb called Redbridge, home to about 14,432 people; this one stands 0.3 km from its centre.
Redbridge has slipped a little, from 79.6% within three minutes in the previous 13 periods to 75.1% in the latest 13, a fall of 4.5 percentage points. Cancellations rose to 2.1% of scheduled stops from 1.5%, which is 0.6 percentage points more.
Compared with 3 stations of a similar size in South East, Redbridge is the least punctual, at 75.1%. All of them are ahead, including Bursledon (78.7%), Hamble (78.3%) and Sholing (77.8%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| South Western Railway | 13,144 | 75.1% | 2.1% |
Operators with their own page for this station are linked to it.
Late train at Redbridge? Delay Repay
These operators call at Redbridge and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 958 | 72.6% | 0.6% |
| Period 6 of 2026-27 | 1,018 | 75.2% | 0.8% |
| Period 5 of 2026-27 | 1,021 | 65.9% | 1.0% |
| Period 4 of 2026-27 | 1,021 | 64.6% | 3.2% |
| Period 3 of 2026-27 | 1,011 | 76.2% | 3.6% |
| Period 2 of 2026-27 | 1,021 | 74.6% | 3.1% |
| Period 1 of 2026-27 | 1,104 | 82.7% | 1.1% |
| Period 13 of 2025-26 | 1,125 | 81.3% | 1.4% |
| Period 12 of 2025-26 | 898 | 77.8% | 0.9% |
| Period 11 of 2025-26 | 1,022 | 81.6% | 4.7% |
| Period 10 of 2025-26 | 926 | 80.1% | 3.0% |
| Period 9 of 2025-26 | 1,025 | 69.7% | 2.0% |
| Period 8 of 2025-26 | 994 | 73.1% | 1.9% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South East
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out