South Western Railway at Sholing
All trains at SholingSouth Western Railway across BritainSouth East
How this operator is doing here
South Western Railway had 12,950 scheduled stops at Sholing in the 13 periods to Period 7 of 2026-27, 100% of the station's total. 77.8% of recorded arrivals came within three minutes and 1.6% of stops were cancelled.
South Western Railway trains at Sholing also serve Woolston (0.9 km west, 75.3% on time, 2.1% cancelled), Bitterne (2.5 km north, 77.5% on time, 1.5% cancelled), Netley (2.9 km south-east, 79.4% on time, 2.2% cancelled), St Denys (3.3 km north-west, 73.2% on time, 2.2% cancelled), Southampton Central (3.7 km west, 68.0% on time, 2.9% cancelled) and Hamble (3.7 km south-east, 78.3% on time, 1.7% cancelled), which are the stations on its network closest to Sholing.
Within 30 km of here, South Western Railway runs best at Ryde St Johns Road, 24.1 km south-east (98.7%), and worst at Winchester, 19.2 km north (67.8%).
The busiest South Western Railway station within 30 km of Sholing is Southampton Central, 3.7 km west, with about 189 scheduled stops a day.
South Western Railway at Sholing has slipped sharply. 77.8% of stops came within three minutes of the timetable in the latest 13 periods, 9.1 percentage points worse than the 86.9% recorded in the 13 before. Cancellations held steady at 1.6% of scheduled stops, against 1.2% before.
Period by period
See how South Western Railway Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 999 | 61.5% | 1.7% |
| Period 6 of 2026-27 | 929 | 51.4% | 1.2% |
| Period 5 of 2026-27 | 1,000 | 74.1% | 1.2% |
| Period 4 of 2026-27 | 965 | 75.1% | 0.6% |
| Period 3 of 2026-27 | 997 | 77.4% | 2.9% |
| Period 2 of 2026-27 | 1,006 | 77.6% | 3.6% |
| Period 1 of 2026-27 | 1,147 | 85.3% | 1.2% |
| Period 13 of 2025-26 | 1,096 | 89.2% | 0.4% |
| Period 12 of 2025-26 | 931 | 86.7% | 1.8% |
| Period 11 of 2025-26 | 996 | 88.4% | 1.7% |
| Period 10 of 2025-26 | 888 | 84.3% | 1.7% |
| Period 9 of 2025-26 | 996 | 77.6% | 1.0% |
| Period 8 of 2025-26 | 1,000 | 80.4% | 2.4% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Sholing
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| GTR | 2 | – | – |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out