Shildon
SHDNorth EastManaged by Northern Trains
How this station is performing
Shildon has usable figures for 12 of the last 13 four-week periods to Period 7 of 2026-27, covering 11,247 scheduled stops, about 31 a day. In those periods 86.3% of stops arrived within three minutes of the timetable and 2.2% of scheduled stops were cancelled.
Shildon opened on 27 September 1825. It was moved to the site it uses now on 9 December 1842. Of the 5 stations nearest to it with a known opening date, Shildon is the oldest; the next oldest, North Road (Darlington), dates from 1825.
The nearest stations to Shildon are Newton Aycliffe (3.3 km south-east), Bishop Auckland (4.4 km north-west), Heighington (4.8 km south-east), North Road (Darlington) (11.4 km south-east) and Darlington (13.1 km south-east). 3 stations lie within 10 km in all. Of the five, North Road (Darlington) is the most punctual at 88.8% and Darlington the least at 74.7%, with Shildon on 86.3%.
Shildon is one of 2 stations named after a town called Shildon, home to about 10,495 people; this one stands 1.0 km from its centre.
Compared with 3 stations of a similar size in North East, Shildon is the least punctual, at 86.3%. All of them are ahead, including Heighington (87.4%), Newton Aycliffe (88.0%) and North Road (Darlington) (88.8%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Northern | 11,247 | 86.3% | 2.2% |
Operators with their own page for this station are linked to it.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 880 | 88.6% | 0.8% |
| Period 6 of 2026-27 | 882 | 90.3% | 2.9% |
| Period 5 of 2026-27 | 880 | 80.3% | 2.7% |
| Period 4 of 2026-27 | 880 | 87.2% | 1.7% |
| Period 3 of 2026-27 | 880 | 90.3% | 0.9% |
| Period 2 of 2026-27 | 871 | 84.8% | 2.1% |
| Period 1 of 2026-27 | 1,008 | – | 1.5% |
| Period 13 of 2025-26 | 912 | 87.3% | 2.0% |
| Period 12 of 2025-26 | 880 | 88.7% | 2.7% |
| Period 11 of 2025-26 | 880 | 89.6% | 1.4% |
| Period 10 of 2025-26 | 758 | 86.1% | 5.1% |
| Period 9 of 2025-26 | 738 | 80.9% | 3.0% |
| Period 8 of 2025-26 | 798 | 80.1% | 2.6% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in North East
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Heighington | 11,247 | 87.4% | 2.1% |
| Newton Aycliffe | 11,247 | 88.0% | 2.1% |
| North Road (Darlington) | 11,247 | 88.8% | 2.1% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out