CrossCountry at Sheffield
All trains at SheffieldCrossCountry across BritainYorkshire and The Humber
How this operator is doing here
CrossCountry had 16,885 scheduled stops at Sheffield in the 13 periods to Period 7 of 2026-27, 9% of the station's total. 51.7% of recorded arrivals came within three minutes and 3.4% of stops were cancelled.
CrossCountry trains at Sheffield also serve Chesterfield (15.8 km south, 54.2% on time, 2.6% cancelled), Doncaster (26.6 km north-east, 57.1% on time, 5.7% cancelled), Wakefield Westgate (33.9 km north, 53.4% on time, 4.9% cancelled), Macclesfield (45.7 km west, 57.8% on time, 6.8% cancelled), Bramhall (46.5 km west, – on time, – cancelled) and Stockport (46.6 km west, 60.1% on time, 6.8% cancelled), which are the stations on its network closest to Sheffield.
The busiest CrossCountry station within 30 km of Sheffield is Chesterfield, 15.8 km south, with about 33 scheduled stops a day.
Of the 4 operators with enough records at Sheffield, CrossCountry is the least punctual, at 51.7%.
Sheffield is the least punctual station on the CrossCountry network, out of 99 ranked stations: 51.7% here against 63.2% across the whole network, which is 11.5 percentage points worse.
CrossCountry at Sheffield has slipped sharply. 51.7% of stops came within three minutes of the timetable in the latest 13 periods, 7.8 percentage points worse than the 59.5% recorded in the 13 before. Cancellations held steady at 3.4% of scheduled stops, against 3.0% before.
Period by period
See how CrossCountry Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,353 | 54.8% | 3.9% |
| Period 6 of 2026-27 | 1,360 | 51.8% | 5.7% |
| Period 5 of 2026-27 | 1,403 | 48.9% | 2.8% |
| Period 4 of 2026-27 | 1,362 | 46.4% | 3.4% |
| Period 3 of 2026-27 | 1,274 | 48.4% | 3.8% |
| Period 2 of 2026-27 | 1,298 | 42.6% | 3.2% |
| Period 1 of 2026-27 | 1,526 | 57.2% | 2.0% |
| Period 13 of 2025-26 | 1,417 | 53.1% | 2.3% |
| Period 12 of 2025-26 | 1,147 | 56.8% | 1.8% |
| Period 11 of 2025-26 | 1,302 | 61.5% | 4.1% |
| Period 10 of 2025-26 | 1,102 | 55.2% | 6.4% |
| Period 9 of 2025-26 | 1,197 | 43.3% | 2.9% |
| Period 8 of 2025-26 | 1,144 | 52.4% | 1.8% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Sheffield
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Northern | 116,300 | 76.0% | 2.9% |
| East Midlands Railway | 35,466 | 57.7% | 5.4% |
| TransPennine Express | 14,095 | 61.0% | 2.3% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out