Northern at Sheffield
All trains at SheffieldNorthern across BritainYorkshire and The Humber
How this operator is doing here
Northern had 116,300 scheduled stops at Sheffield in the 13 periods to Period 7 of 2026-27, 64% of the station's total. 76.0% of recorded arrivals came within three minutes and 2.9% of stops were cancelled.
Northern trains at Sheffield also serve Darnall (3.4 km east, 83.2% on time, 2.1% cancelled), Meadowhall (5.4 km north-east, 75.7% on time, 2.3% cancelled), Dore and Totley (6.6 km south-west, 72.2% on time, 2.0% cancelled), Woodhouse (7.1 km east, 81.8% on time, 2.0% cancelled), Dronfield (8.6 km south, 77.1% on time, 1.7% cancelled) and Rotherham Central (8.9 km north-east, 77.6% on time, 3.3% cancelled), which are the stations on its network closest to Sheffield.
Within 30 km of here, Northern runs best at Dove Holes, 29.7 km west (89.2%), and worst at Fitzwilliam, 28.8 km north (66.1%).
The busiest Northern station within 30 km of Sheffield is Meadowhall, 5.4 km north-east, with about 246 scheduled stops a day.
Of the 4 operators with enough records at Sheffield, Northern is the most punctual, at 76.0%.
For Northern, Sheffield is the 339th best of 493 ranked stations. Its 76.0% here is 2.6 percentage points below the 78.6% across the whole network.
Northern at Sheffield has slipped a little, from 78.0% within three minutes in the previous 13 periods to 76.0% in the latest 13, a fall of 2.0 percentage points. Cancellations fell to 2.9% of scheduled stops from 4.2%, which is 1.3 percentage points fewer.
Period by period
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 9,179 | 79.1% | 1.8% |
| Period 6 of 2026-27 | 9,185 | 79.0% | 1.8% |
| Period 5 of 2026-27 | 9,216 | 76.6% | 5.4% |
| Period 4 of 2026-27 | 9,161 | 75.9% | 6.5% |
| Period 3 of 2026-27 | 9,120 | 73.7% | 3.4% |
| Period 2 of 2026-27 | 8,827 | 72.0% | 3.7% |
| Period 1 of 2026-27 | 10,606 | 79.2% | 2.0% |
| Period 13 of 2025-26 | 10,026 | 79.5% | 1.2% |
| Period 12 of 2025-26 | 7,816 | 74.5% | 2.0% |
| Period 11 of 2025-26 | 8,867 | 78.4% | 2.0% |
| Period 10 of 2025-26 | 7,793 | 75.9% | 3.5% |
| Period 9 of 2025-26 | 8,264 | 67.8% | 2.9% |
| Period 8 of 2025-26 | 8,240 | 74.6% | 1.3% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Sheffield
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| East Midlands Railway | 35,466 | 57.7% | 5.4% |
| CrossCountry | 16,885 | 51.7% | 3.4% |
| TransPennine Express | 14,095 | 61.0% | 2.3% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out