East Midlands Railway at Sheffield
All trains at SheffieldEast Midlands Railway across BritainYorkshire and The Humber
How this operator is doing here
East Midlands Railway had 35,466 scheduled stops at Sheffield in the 13 periods to Period 7 of 2026-27, 19% of the station's total. 57.7% of recorded arrivals came within three minutes and 5.4% of stops were cancelled.
East Midlands Railway trains at Sheffield also serve Dore and Totley (6.6 km south-west, 45.9% on time, 3.8% cancelled), Dronfield (8.6 km south, 65.2% on time, 3.2% cancelled), Grindleford (13.6 km south-west, 63.8% on time, 3.3% cancelled), Hathersage (13.9 km south-west, 58.6% on time, 3.3% cancelled), Bamford (15.7 km west, – on time, – cancelled) and Chesterfield (15.8 km south, 61.3% on time, 4.3% cancelled), which are the stations on its network closest to Sheffield.
Within 30 km of here, East Midlands Railway runs best at Doncaster, 26.6 km north-east (88.6%), and worst at Chesterfield, 15.8 km south (61.3%).
The busiest East Midlands Railway station within 30 km of Sheffield is Chesterfield, 15.8 km south, with about 97 scheduled stops a day.
East Midlands Railway at Sheffield has slipped sharply. 57.7% of stops came within three minutes of the timetable in the latest 13 periods, 8.9 percentage points worse than the 66.6% recorded in the 13 before. Cancellations rose to 5.4% of scheduled stops from 3.8%, which is 1.6 percentage points more.
Period by period
See how East Midlands Railway Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 2,690 | 58.6% | 4.3% |
| Period 6 of 2026-27 | 2,555 | 56.9% | 4.5% |
| Period 5 of 2026-27 | 2,323 | 57.4% | 6.7% |
| Period 4 of 2026-27 | 2,660 | 53.3% | 8.6% |
| Period 3 of 2026-27 | 2,470 | 49.0% | 8.9% |
| Period 2 of 2026-27 | 2,775 | 52.7% | 6.8% |
| Period 1 of 2026-27 | 3,191 | 57.4% | 5.1% |
| Period 13 of 2025-26 | 3,064 | 55.2% | 5.9% |
| Period 12 of 2025-26 | 2,841 | 62.8% | 4.2% |
| Period 11 of 2025-26 | 2,801 | 65.3% | 4.8% |
| Period 10 of 2025-26 | 2,529 | 62.5% | 4.0% |
| Period 9 of 2025-26 | 2,766 | 56.3% | 4.5% |
| Period 8 of 2025-26 | 2,801 | 61.1% | 2.5% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Sheffield
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Northern | 116,300 | 76.0% | 2.9% |
| CrossCountry | 16,885 | 51.7% | 3.4% |
| TransPennine Express | 14,095 | 61.0% | 2.3% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out