Settle
SETYorkshire and The HumberManaged by Northern Trains
How this station is performing
Settle has usable figures for 12 of the last 13 four-week periods to Period 7 of 2026-27, covering 6,544 scheduled stops, about 18 a day. In those periods 76.4% of stops arrived within three minutes of the timetable and 1.0% of scheduled stops were cancelled.
Settle opened on 1 May 1876, 150 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Settle is the newest; the oldest, Giggleswick, opened in 1849.
The nearest stations to Settle are Giggleswick (1.5 km west), Long Preston (5.8 km south), Hellifield (7.2 km south-east), Horton-in-Ribblesdale (9.3 km north) and Clapham (North Yorkshire) (9.4 km north-west). 5 stations lie within 10 km in all. At 76.4%, Settle is less punctual than all of them; the best of the five, Giggleswick, manages 82.2%.
Settle takes its name from a market town called Settle, home to about 2,712 people, and the station stands 0.6 km from its centre.
Across the whole run of data, the weakest four-week period for Settle was Period 8 of 2024-25, at 52.5%, some time before the latest year. The strongest was Period 13 of 2024-25, at 89.1%, and the two are 36.6 percentage points apart. Cancellations peaked at 6.0% of scheduled stops in Period 11 of 2023-24, against 1.0% over the latest 13 periods.
2 of 3 stations of a similar size in Yorkshire and The Humber are more punctual than Settle on 76.4%. The comparison group includes Ribblehead (75.8%), Ulleskelf (80.0%) and Horton-in-Ribblesdale (77.5%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Northern | 6,544 | 76.4% | 1.0% |
Operators with their own page for this station are linked to it.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 500 | 76.6% | 0.4% |
| Period 6 of 2026-27 | 500 | 79.3% | 0.0% |
| Period 5 of 2026-27 | 500 | 81.6% | 0.6% |
| Period 4 of 2026-27 | 500 | 78.5% | 1.4% |
| Period 3 of 2026-27 | 500 | 79.5% | 0.4% |
| Period 2 of 2026-27 | 500 | 71.7% | 2.8% |
| Period 1 of 2026-27 | 577 | – | 0.3% |
| Period 13 of 2025-26 | 548 | 81.8% | 0.0% |
| Period 12 of 2025-26 | 500 | 82.6% | 2.8% |
| Period 11 of 2025-26 | 500 | 80.0% | 1.2% |
| Period 10 of 2025-26 | 427 | 71.8% | 0.5% |
| Period 9 of 2025-26 | 500 | 68.8% | 1.8% |
| Period 8 of 2025-26 | 492 | 62.1% | 0.8% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Yorkshire and The Humber
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Ribblehead | 6,438 | 75.8% | 1.0% |
| Ulleskelf | 6,031 | 80.0% | 2.5% |
| Horton-in-Ribblesdale | 5,864 | 77.5% | 1.0% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out