Rosyth
ROSScotlandManaged by ScotRail
How this station is performing
Rosyth had 24,027 scheduled stops to Period 7 of 2026-27, about 66 a day. 85.7% of recorded arrivals were within three minutes of the timetable and 1.6% of scheduled stops were cancelled.
Rosyth opened on 1 January 1918, 108 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Inverkeithing is the oldest (1877) and Dunfermline Queen Margaret the newest (2000), with Rosyth in between.
The nearest stations to Rosyth are Inverkeithing (2.2 km south-east), Dunfermline City (3.0 km north-west), Dalgety Bay (3.7 km east), Dunfermline Queen Margaret (3.9 km north) and North Queensferry (4.2 km south-east). 8 stations lie within 10 km in all. Of the five, Dunfermline City is the most punctual at 87.2% and Dalgety Bay the least at 79.2%, with Rosyth on 85.7%.
Rosyth takes its name from a town called Rosyth, home to about 13,780 people, and the station stands 1.3 km from its centre.
For Rosyth, the weakest four-week period in the data is a recent one: Period 7 of 2026-27, when only 74.1% of stops arrived within three minutes of the timetable. The strongest was Period 12 of 2024-25, at 93.3%, which is 19.2 percentage points higher. Cancellations peaked at 10.7% of scheduled stops in Period 8 of 2023-24, against 1.6% over the latest 13 periods.
Compared with 3 stations of a similar size in Scotland, Rosyth is the most punctual, at 85.7%. The comparison group includes Cowdenbeath (83.3%), Balloch (84.9%) and Renton (84.2%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| ScotRail | 24,027 | 85.7% | 1.6% |
Operators with their own page for this station are linked to it.
Late train at Rosyth? Delay Repay
These operators call at Rosyth and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,852 | 74.1% | 1.1% |
| Period 6 of 2026-27 | 1,839 | 85.3% | 2.2% |
| Period 5 of 2026-27 | 1,841 | 82.8% | 1.8% |
| Period 4 of 2026-27 | 1,838 | 84.5% | 1.6% |
| Period 3 of 2026-27 | 1,837 | 88.5% | 2.0% |
| Period 2 of 2026-27 | 1,836 | 89.8% | 1.1% |
| Period 1 of 2026-27 | 2,126 | 88.4% | 1.8% |
| Period 13 of 2025-26 | 2,005 | 91.0% | 2.0% |
| Period 12 of 2025-26 | 1,836 | 89.4% | 1.1% |
| Period 11 of 2025-26 | 1,822 | 88.3% | 1.4% |
| Period 10 of 2025-26 | 1,565 | 85.8% | 1.1% |
| Period 9 of 2025-26 | 1,816 | 82.8% | 2.6% |
| Period 8 of 2025-26 | 1,814 | 82.8% | 1.3% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Scotland
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Cowdenbeath | 24,027 | 83.3% | 1.6% |
| Balloch | 24,041 | 84.9% | 4.3% |
| Renton | 24,041 | 84.2% | 4.4% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out