Balloch
BHCScotlandManaged by ScotRail
How this station is performing
Balloch had 24,041 scheduled stops to Period 7 of 2026-27, about 66 a day. 84.9% of recorded arrivals were within three minutes of the timetable and 4.3% of scheduled stops were cancelled.
Balloch opened on 24 April 1988, 38 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Balloch is the newest; the oldest, Alexandria, opened in 1850.
The nearest stations to Balloch are Alexandria (1.9 km south), Renton (3.5 km south), Dalreoch (6.1 km south), Dumbarton Central (6.3 km south) and Cardross (6.4 km south-west). 12 stations lie within 10 km in all. Of the five, Cardross is the most punctual at 87.9% and Dumbarton Central the least at 82.2%, with Balloch on 84.9%.
Balloch is one of 3 stations named after a town called Balloch, home to about 6,050 people; this one stands 0.2 km from its centre.
Across the whole run of data, the weakest four-week period for Balloch was Period 8 of 2024-25, at 65.0%, some time before the latest year. The strongest was Period 3 of 2026-27, at 90.5%, and the two are 25.5 percentage points apart.
1 of 3 stations of a similar size in Scotland are more punctual than Balloch on 84.9%. The comparison group includes Renton (84.2%), Cowdenbeath (83.3%) and Rosyth (85.7%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| ScotRail | 24,041 | 84.9% | 4.3% |
Operators with their own page for this station are linked to it.
Late train at Balloch? Delay Repay
These operators call at Balloch and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,856 | 85.4% | 7.0% |
| Period 6 of 2026-27 | 1,856 | 87.3% | 2.5% |
| Period 5 of 2026-27 | 1,856 | 88.6% | 4.4% |
| Period 4 of 2026-27 | 1,856 | 88.4% | 4.1% |
| Period 3 of 2026-27 | 1,856 | 90.5% | 2.0% |
| Period 2 of 2026-27 | 1,856 | 86.7% | 3.1% |
| Period 1 of 2026-27 | 2,124 | 87.9% | 2.2% |
| Period 13 of 2025-26 | 2,052 | 88.7% | 3.6% |
| Period 12 of 2025-26 | 1,856 | 83.8% | 4.4% |
| Period 11 of 2025-26 | 1,856 | 85.8% | 2.9% |
| Period 10 of 2025-26 | 1,305 | 77.4% | 6.6% |
| Period 9 of 2025-26 | 1,856 | 74.9% | 7.2% |
| Period 8 of 2025-26 | 1,856 | 74.6% | 7.1% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Scotland
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Renton | 24,041 | 84.2% | 4.4% |
| Cowdenbeath | 24,027 | 83.3% | 1.6% |
| Rosyth | 24,027 | 85.7% | 1.6% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out