Renton
RTNScotlandManaged by ScotRail
How this station is performing
Renton had 24,041 scheduled stops to Period 7 of 2026-27, about 66 a day. 84.2% of recorded arrivals were within three minutes of the timetable and 4.4% of scheduled stops were cancelled.
Renton opened on 15 July 1850, 176 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Renton is the oldest; the next oldest, Alexandria, dates from 1850.
The nearest stations to Renton are Alexandria (1.7 km north), Dalreoch (2.6 km south), Dumbarton Central (2.9 km south-east), Balloch (3.5 km north) and Dumbarton East (3.7 km south-east). 16 stations lie within 10 km in all. Of the five, Dalreoch is the most punctual at 86.3% and Dumbarton Central the least at 82.2%, with Renton on 84.2%.
Renton takes its name from a Village called Renton, home to about 2,340 people, and the station stands 1.2 km from its centre.
Across the whole run of data, the weakest four-week period for Renton was Period 8 of 2024-25, at 52.5%, some time before the latest year. The strongest was Period 3 of 2026-27, at 90.1%, and the two are 37.6 percentage points apart.
2 of 3 stations of a similar size in Scotland are more punctual than Renton on 84.2%. The comparison group includes Balloch (84.9%), Cowdenbeath (83.3%) and Rosyth (85.7%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| ScotRail | 24,041 | 84.2% | 4.4% |
Operators with their own page for this station are linked to it.
Late train at Renton? Delay Repay
These operators call at Renton and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,856 | 84.2% | 7.1% |
| Period 6 of 2026-27 | 1,856 | 86.7% | 2.6% |
| Period 5 of 2026-27 | 1,856 | 88.4% | 4.8% |
| Period 4 of 2026-27 | 1,856 | 87.8% | 4.1% |
| Period 3 of 2026-27 | 1,856 | 90.1% | 2.0% |
| Period 2 of 2026-27 | 1,856 | 85.5% | 3.1% |
| Period 1 of 2026-27 | 2,124 | 87.6% | 2.2% |
| Period 13 of 2025-26 | 2,052 | 87.9% | 3.6% |
| Period 12 of 2025-26 | 1,856 | 82.5% | 4.6% |
| Period 11 of 2025-26 | 1,856 | 84.0% | 2.9% |
| Period 10 of 2025-26 | 1,305 | 75.3% | 6.8% |
| Period 9 of 2025-26 | 1,856 | 74.2% | 7.2% |
| Period 8 of 2025-26 | 1,856 | 73.1% | 7.1% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Scotland
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Balloch | 24,041 | 84.9% | 4.3% |
| Cowdenbeath | 24,027 | 83.3% | 1.6% |
| Rosyth | 24,027 | 85.7% | 1.6% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out