Richmond (London)
RMDLondonManaged by South Western Railway
How this station is performing
Richmond (London) had 141,225 scheduled stops to Period 7 of 2026-27, about 388 a day. 88.8% of recorded arrivals were within three minutes of the timetable and 5.7% of scheduled stops were cancelled.
Richmond (London) opened on 27 July 1846, 180 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Richmond (London) is the oldest; the next oldest, Mortlake, dates from 1846.
The nearest stations to Richmond (London) are North Sheen (1.0 km east), St Margarets (London) (1.6 km south-west), Kew Gardens (1.9 km north-east), Mortlake (2.4 km east) and Twickenham (2.5 km south-west). 67 stations lie within 10 km in all. Of the five, Mortlake is the most punctual at 89.5% and Kew Gardens the least at 85.0%, with Richmond (London) on 88.8%.
Richmond (London) is named after Richmond, an area of London, home to about 21,469 people, but the station stands 0.8 km from its centre.
2 operators call at Richmond (London): South Western Railway (89.6%, 63% of stops) and London Overground (87.5%, 37% of stops). They are close together, with South Western Railway leading on 89.6% and London Overground trailing on 87.5%, a gap of 2.1 percentage points.
Compared with 3 stations of a similar size in London, Richmond (London) is the most punctual, at 88.8%. The comparison group includes Norwood Junction (88.1%), Bromley South (82.4%) and London Kings Cross (76.9%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| South Western Railway | 88,700 | 89.6% | 3.4% |
| London Overground | 52,525 | 87.5% | 9.5% |
Operators with their own page for this station are linked to it.
Late train at Richmond (London)? Delay Repay
These operators call at Richmond (London) and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 11,195 | 91.8% | 3.8% |
| Period 6 of 2026-27 | 10,917 | 89.5% | 5.9% |
| Period 5 of 2026-27 | 11,109 | 89.9% | 8.9% |
| Period 4 of 2026-27 | 11,160 | 88.9% | 8.1% |
| Period 3 of 2026-27 | 10,557 | 87.7% | 5.4% |
| Period 2 of 2026-27 | 10,808 | 86.6% | 8.9% |
| Period 1 of 2026-27 | 12,058 | 90.1% | 4.4% |
| Period 13 of 2025-26 | 11,923 | 90.6% | 2.7% |
| Period 12 of 2025-26 | 10,726 | 88.9% | 5.2% |
| Period 11 of 2025-26 | 10,558 | 89.5% | 4.3% |
| Period 10 of 2025-26 | 8,619 | 89.4% | 4.8% |
| Period 9 of 2025-26 | 10,584 | 84.8% | 6.1% |
| Period 8 of 2025-26 | 11,011 | 86.0% | 5.6% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in London
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Norwood Junction | 143,117 | 88.1% | 5.1% |
| Bromley South | 138,845 | 82.4% | 2.0% |
| London Kings Cross | 143,801 | 76.9% | 4.8% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out