Bromley South
BMSLondonManaged by Southeastern
How this station is performing
Bromley South had 138,845 scheduled stops to Period 7 of 2026-27, about 381 a day. 82.4% of recorded arrivals were within three minutes of the timetable and 2.0% of scheduled stops were cancelled.
Bromley South opened on 5 July 1858, 168 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Bromley South is the oldest; the next oldest, Shortlands, dates from 1858.
The nearest stations to Bromley South are Bromley North (1.0 km north), Shortlands (1.3 km north-west), Sundridge Park (1.6 km north), Bickley (1.8 km east) and Ravensbourne (2.4 km north-west). 75 stations lie within 10 km in all. At 82.4%, Bromley South is less punctual than all of them; the best of the five, Sundridge Park, manages 99.4%.
Bromley South is named after Bromley, an area of London, home to about 87,889 people, but the station stands 0.7 km from its centre.
2 operators call at Bromley South: Southeastern (80.6%, 76% of stops) and GTR (87.8%, 24% of stops). The operator you travel with matters: GTR reaches 87.8% within three minutes while Southeastern manages 80.6%, a gap of 7.2 percentage points.
Compared with 3 stations of a similar size in London, Bromley South is the least punctual, at 82.4%. All of them are ahead, including Richmond (London) (88.8%), New Cross Gate (91.6%) and Norwood Junction (88.1%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Southeastern | 105,384 | 80.6% | 1.6% |
| GTR | 33,461 | 87.8% | 3.2% |
Operators with their own page for this station are linked to it.
Late train at Bromley South? Delay Repay
These operators call at Bromley South and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 10,883 | 80.8% | 1.4% |
| Period 6 of 2026-27 | 10,567 | 78.8% | 2.6% |
| Period 5 of 2026-27 | 11,446 | 76.2% | 2.5% |
| Period 4 of 2026-27 | 10,839 | 84.6% | 1.8% |
| Period 3 of 2026-27 | 10,601 | 80.6% | 2.6% |
| Period 2 of 2026-27 | 10,241 | 83.2% | 2.6% |
| Period 1 of 2026-27 | 12,017 | 90.0% | 1.0% |
| Period 13 of 2025-26 | 11,758 | 87.6% | 1.6% |
| Period 12 of 2025-26 | 10,421 | 87.3% | 1.3% |
| Period 11 of 2025-26 | 10,734 | 84.5% | 1.7% |
| Period 10 of 2025-26 | 8,344 | 81.8% | 3.1% |
| Period 9 of 2025-26 | 10,561 | 77.1% | 2.6% |
| Period 8 of 2025-26 | 10,433 | 76.7% | 2.0% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in London
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Richmond (London) | 141,225 | 88.8% | 5.7% |
| New Cross Gate | 136,490 | 91.6% | 3.8% |
| Norwood Junction | 143,117 | 88.1% | 5.1% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out