South Western Railway at Richmond (London)
All trains at Richmond (London)South Western Railway across BritainLondon
How this operator is doing here
South Western Railway had 88,700 scheduled stops at Richmond (London) in the 13 periods to Period 7 of 2026-27, 63% of the station's total. 89.6% of recorded arrivals came within three minutes and 3.4% of stops were cancelled.
South Western Railway trains at Richmond (London) also serve North Sheen (1.0 km east, 88.7% on time, 4.0% cancelled), St Margarets (London) (1.6 km south-west, 88.8% on time, 3.9% cancelled), Mortlake (2.4 km east, 89.5% on time, 4.0% cancelled), Twickenham (2.5 km south-west, 87.8% on time, 2.9% cancelled), Syon Lane (2.7 km north-west, 88.9% on time, 3.5% cancelled) and Brentford (2.8 km north, 86.8% on time, 3.5% cancelled), which are the stations on its network closest to Richmond (London).
Within 30 km of here, South Western Railway runs best at Bagshot, 29.1 km west (97.0%), and worst at Woking, 24.0 km south-west (73.7%).
The busiest South Western Railway station within 30 km of Richmond (London) is London Waterloo, 13.7 km east, with about 1,171 scheduled stops a day.
South Western Railway at Richmond (London) has edged up: 89.6% of stops came within three minutes of the timetable in the latest 13 periods, 3.7 percentage points better than the 85.9% of the 13 before. Cancellations fell to 3.4% of scheduled stops from 3.9%, which is 0.5 percentage points fewer.
Period by period
See how South Western Railway Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 6,919 | 92.3% | 2.6% |
| Period 6 of 2026-27 | 6,779 | 91.3% | 3.0% |
| Period 5 of 2026-27 | 6,960 | 90.5% | 3.2% |
| Period 4 of 2026-27 | 6,898 | 90.9% | 3.0% |
| Period 3 of 2026-27 | 6,683 | 88.4% | 3.1% |
| Period 2 of 2026-27 | 6,559 | 87.9% | 7.0% |
| Period 1 of 2026-27 | 7,391 | 91.4% | 3.0% |
| Period 13 of 2025-26 | 7,325 | 92.3% | 1.7% |
| Period 12 of 2025-26 | 6,841 | 89.9% | 4.4% |
| Period 11 of 2025-26 | 6,750 | 91.9% | 1.9% |
| Period 10 of 2025-26 | 5,904 | 90.1% | 3.7% |
| Period 9 of 2025-26 | 6,772 | 83.6% | 2.8% |
| Period 8 of 2025-26 | 6,919 | 83.1% | 5.2% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Richmond (London)
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| London Overground | 52,525 | 87.5% | 9.5% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out