Norwood Junction
NWDLondonManaged by London Overground
How this station is performing
Norwood Junction had 143,117 scheduled stops to Period 7 of 2026-27, about 393 a day. 88.1% of recorded arrivals were within three minutes of the timetable and 5.1% of scheduled stops were cancelled.
Norwood Junction opened on 5 June 1839. It was moved to the site it uses now on 1 June 1859. Of the 5 stations nearest to it with a known opening date, Norwood Junction is the oldest; the next oldest, Anerley, dates from 1839.
The nearest stations to Norwood Junction are Selhurst (1.1 km south-west), Birkbeck (1.5 km north-east), Thornton Heath (1.8 km west), Elmers End (1.8 km east) and Anerley (1.9 km north). 99 stations lie within 10 km in all. At 88.1%, Norwood Junction is less punctual than all of them; the best of the five, Birkbeck, manages 98.1%.
Norwood Junction is named after South Norwood, an area of London, but the station stands 0.3 km from its centre.
2 operators call at Norwood Junction: GTR (86.8%, 64% of stops) and London Overground (90.5%, 36% of stops). They are close together, with London Overground leading on 90.5% and GTR trailing on 86.8%, a gap of 3.7 percentage points.
1 of 3 stations of a similar size in London are more punctual than Norwood Junction on 88.1%. The comparison group includes London Kings Cross (76.9%), Richmond (London) (88.8%) and Bromley South (82.4%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| GTR | 92,274 | 86.8% | 3.9% |
| London Overground | 50,843 | 90.5% | 7.2% |
Operators with their own page for this station are linked to it.
Late train at Norwood Junction? Delay Repay
These operators call at Norwood Junction and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 11,168 | 85.5% | 3.8% |
| Period 6 of 2026-27 | 10,594 | 86.1% | 6.2% |
| Period 5 of 2026-27 | 10,594 | 85.8% | 7.0% |
| Period 4 of 2026-27 | 10,745 | 87.2% | 7.5% |
| Period 3 of 2026-27 | 10,577 | 87.4% | 4.2% |
| Period 2 of 2026-27 | 10,873 | 89.9% | 3.8% |
| Period 1 of 2026-27 | 13,092 | 91.4% | 4.8% |
| Period 13 of 2025-26 | 11,829 | 90.8% | 3.0% |
| Period 12 of 2025-26 | 11,157 | 88.9% | 7.5% |
| Period 11 of 2025-26 | 10,853 | 86.8% | 5.6% |
| Period 10 of 2025-26 | 9,821 | 90.1% | 4.0% |
| Period 9 of 2025-26 | 11,072 | 86.5% | 5.5% |
| Period 8 of 2025-26 | 10,742 | 87.9% | 3.4% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in London
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| London Kings Cross | 143,801 | 76.9% | 4.8% |
| Richmond (London) | 141,225 | 88.8% | 5.7% |
| Bromley South | 138,845 | 82.4% | 2.0% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out