London Overground at Richmond (London)
All trains at Richmond (London)London Overground across BritainLondon
How this operator is doing here
London Overground had 52,525 scheduled stops at Richmond (London) in the 13 periods to Period 7 of 2026-27, 37% of the station's total. 87.5% of recorded arrivals came within three minutes and 9.5% of stops were cancelled.
London Overground trains at Richmond (London) also serve Kew Gardens (1.9 km north-east, 85.0% on time, 9.4% cancelled), Gunnersbury (3.6 km north-east, 84.8% on time, 9.3% cancelled), South Acton (4.6 km north-east, – on time, 8.9% cancelled), Acton Central (5.7 km north-east, 85.8% on time, 8.3% cancelled), Kensington Olympia (7.4 km north-east, 86.7% on time, 11.0% cancelled) and Shepherd's Bush (7.4 km north-east, 85.7% on time, 10.0% cancelled), which are the stations on its network closest to Richmond (London).
Within 30 km of here, London Overground runs best at Barking Riverside, 29.5 km east (96.7%), and worst at Finchley Road and Frognal, 12.6 km north-east (75.2%).
The busiest London Overground station within 30 km of Richmond (London) is Highbury and Islington, 16.5 km north-east, with about 593 scheduled stops a day.
Of the 2 operators with enough records at Richmond (London), London Overground is the least punctual, at 87.5%.
Over three full railway years London Overground at Richmond (London) has got worse each time, from 92.1% within three minutes in 2023-24 to 88.5% in 2024-25 and 87.4% in 2025-26.
Period by period
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 4,276 | 90.9% | 5.6% |
| Period 6 of 2026-27 | 4,138 | 86.4% | 10.7% |
| Period 5 of 2026-27 | 4,149 | 88.7% | 18.5% |
| Period 4 of 2026-27 | 4,262 | 85.2% | 16.4% |
| Period 3 of 2026-27 | 3,874 | 86.6% | 9.2% |
| Period 2 of 2026-27 | 4,249 | 84.6% | 11.8% |
| Period 1 of 2026-27 | 4,667 | 88.0% | 6.6% |
| Period 13 of 2025-26 | 4,598 | 87.9% | 4.4% |
| Period 12 of 2025-26 | 3,885 | 87.1% | 6.6% |
| Period 11 of 2025-26 | 3,808 | 85.1% | 8.6% |
| Period 10 of 2025-26 | 2,715 | 88.0% | 7.2% |
| Period 9 of 2025-26 | 3,812 | 87.3% | 11.9% |
| Period 8 of 2025-26 | 4,092 | 91.0% | 6.4% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Richmond (London)
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| South Western Railway | 88,700 | 89.6% | 3.4% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out