Prestatyn
PRTWalesManaged by TfW Rail
How this station is performing
Prestatyn had 30,643 scheduled stops to Period 7 of 2026-27, about 84 a day. 75.2% of recorded arrivals were within three minutes of the timetable and 2.1% of scheduled stops were cancelled.
Prestatyn opened on 1 May 1848. It was moved to the site it uses now on 28 February 1897. Of the 5 stations nearest to it with a known opening date, Prestatyn is the oldest; the next oldest, Rhyl, dates from 1848.
The nearest stations to Prestatyn are Rhyl (5.8 km west), Abergele and Pensarn (12.6 km west), West Kirby (15.4 km east), Hoylake (16.3 km east) and Manor Road (17.0 km north-east). 1 stations lie within 10 km in all. At 75.2%, Prestatyn is less punctual than all of them; the best of the five, Manor Road, manages 98.4%.
2 operators call at Prestatyn: Transport for Wales (75.9%, 84% of stops) and Avanti (71.8%, 16% of stops). They are close together, with Transport for Wales leading on 75.9% and Avanti trailing on 71.8%, a gap of 4.1 percentage points.
2 of 3 stations of a similar size in Wales are more punctual than Prestatyn on 75.2%. The comparison group includes Colwyn Bay (79.8%), Rhyl (76.2%) and Flint (74.4%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Transport for Wales | 25,868 | 75.9% | 2.0% |
| Avanti | 4,775 | 71.8% | 2.8% |
Operators with their own page for this station are linked to it.
Late train at Prestatyn? Delay Repay
These operators call at Prestatyn and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 2,768 | 77.1% | 1.5% |
| Period 6 of 2026-27 | 2,778 | 67.5% | 2.8% |
| Period 5 of 2026-27 | 2,675 | 71.0% | 2.7% |
| Period 4 of 2026-27 | 2,704 | 73.1% | 2.6% |
| Period 3 of 2026-27 | 2,530 | 73.4% | 2.8% |
| Period 2 of 2026-27 | 2,421 | 71.3% | 2.2% |
| Period 1 of 2026-27 | 2,397 | 81.4% | 1.8% |
| Period 13 of 2025-26 | 2,277 | 82.9% | 1.6% |
| Period 12 of 2025-26 | 2,078 | 82.9% | 1.2% |
| Period 11 of 2025-26 | 2,025 | 82.9% | 2.5% |
| Period 10 of 2025-26 | 1,887 | 79.0% | 1.9% |
| Period 9 of 2025-26 | 2,064 | 67.4% | 2.1% |
| Period 8 of 2025-26 | 2,039 | 71.2% | 1.6% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Wales
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Colwyn Bay | 30,645 | 79.8% | 2.2% |
| Rhyl | 30,694 | 76.2% | 2.2% |
| Flint | 30,273 | 74.4% | 2.1% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out