Transport for Wales at Rhyl
How this operator is doing here
Transport for Wales had 25,919 scheduled stops at Rhyl in the 13 periods to Period 7 of 2026-27, 84% of the station's total. 76.9% of recorded arrivals came within three minutes and 2.0% of stops were cancelled.
Transport for Wales trains at Rhyl also serve Prestatyn (5.8 km east, 75.9% on time, 2.0% cancelled), Abergele and Pensarn (6.8 km south-west, 75.8% on time, 1.4% cancelled), Colwyn Bay (15.9 km west, 80.2% on time, 2.1% cancelled), Glan Conwy (21.2 km west, 75.1% on time, 3.2% cancelled), Llandudno Junction (21.6 km west, 84.4% on time, 2.2% cancelled) and Llandudno (22.5 km west, 89.6% on time, 2.9% cancelled), which are the stations on its network closest to Rhyl.
Within 30 km of here, Transport for Wales runs best at Llandudno, 22.5 km west (89.6%), and worst at Penmaenmawr, 29.4 km west (75.0%).
The busiest Transport for Wales station within 30 km of Rhyl is Llandudno Junction, 21.6 km west, with about 105 scheduled stops a day.
Of the 2 operators with enough records at Rhyl, Transport for Wales is the most punctual, at 76.9%.
For Transport for Wales, Rhyl is the 138th best of 228 ranked stations. Its 76.9% here is 8.1 percentage points below the 85.0% across the whole network.
Period by period
See how Transport for Wales Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 2,404 | 79.3% | 1.6% |
| Period 6 of 2026-27 | 2,414 | 69.7% | 3.4% |
| Period 5 of 2026-27 | 2,311 | 73.7% | 2.3% |
| Period 4 of 2026-27 | 2,340 | 74.9% | 2.1% |
| Period 3 of 2026-27 | 2,188 | 75.8% | 2.9% |
| Period 2 of 2026-27 | 2,057 | 73.0% | 2.2% |
| Period 1 of 2026-27 | 1,981 | 81.0% | 1.6% |
| Period 13 of 2025-26 | 1,876 | 84.3% | 1.8% |
| Period 12 of 2025-26 | 1,714 | 84.7% | 1.1% |
| Period 11 of 2025-26 | 1,661 | 84.4% | 2.2% |
| Period 10 of 2025-26 | 1,572 | 80.2% | 1.5% |
| Period 9 of 2025-26 | 1,717 | 69.1% | 1.8% |
| Period 8 of 2025-26 | 1,684 | 72.7% | 1.4% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Rhyl
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Avanti | 4,775 | 72.3% | 2.9% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out