Avanti at Rhyl
How this operator is doing here
Avanti had 4,775 scheduled stops at Rhyl in the 13 periods to Period 7 of 2026-27, 16% of the station's total. 72.3% of recorded arrivals came within three minutes and 2.9% of stops were cancelled.
Avanti trains at Rhyl also serve Prestatyn (5.8 km east, 71.8% on time, 2.8% cancelled), Colwyn Bay (15.9 km west, 77.3% on time, 2.8% cancelled), Llandudno Junction (21.6 km west, 75.0% on time, 3.1% cancelled), Flint (24.9 km east, 67.5% on time, 2.9% cancelled), Liverpool Lime Street (35.3 km east, 64.9% on time, 5.8% cancelled) and Liverpool South Parkway (40.0 km east, 66.0% on time, 6.9% cancelled), which are the stations on its network closest to Rhyl.
Within 30 km of here, Avanti runs best at Colwyn Bay, 15.9 km west (77.3%), and worst at Flint, 24.9 km east (67.5%).
The busiest Avanti station within 30 km of Rhyl is Prestatyn, 5.8 km east, with about 13 scheduled stops a day.
Avanti at Rhyl improved sharply over the past year. In the latest 13 periods 72.3% of stops came within three minutes of the timetable, up 11.4 percentage points from 60.9% in the 13 before. Cancellations fell to 2.9% of scheduled stops from 4.1%, which is 1.2 percentage points fewer.
Period by period
See how Avanti Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 368 | 77.8% | 0.8% |
| Period 6 of 2026-27 | 368 | 67.0% | 0.3% |
| Period 5 of 2026-27 | 368 | 69.5% | 5.7% |
| Period 4 of 2026-27 | 368 | 67.6% | 6.8% |
| Period 3 of 2026-27 | 345 | 72.2% | 2.0% |
| Period 2 of 2026-27 | 368 | 68.3% | 3.0% |
| Period 1 of 2026-27 | 420 | 82.9% | 2.4% |
| Period 13 of 2025-26 | 406 | 80.6% | 1.0% |
| Period 12 of 2025-26 | 368 | 79.2% | 1.9% |
| Period 11 of 2025-26 | 368 | 79.2% | 3.5% |
| Period 10 of 2025-26 | 319 | 75.6% | 3.8% |
| Period 9 of 2025-26 | 351 | 54.4% | 3.7% |
| Period 8 of 2025-26 | 358 | 62.1% | 2.8% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Rhyl
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Transport for Wales | 25,919 | 76.9% | 2.0% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out