Flint
FLNWalesManaged by TfW Rail
How this station is performing
Flint had 30,273 scheduled stops to Period 7 of 2026-27, about 83 a day. 74.4% of recorded arrivals were within three minutes of the timetable and 2.1% of scheduled stops were cancelled.
Flint opened on 1 May 1848, 178 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Flint is the oldest; the next oldest, Hawarden, dates from 1890.
The nearest stations to Flint are Neston (6.6 km north-east), Shotton (7.5 km south-east), Hawarden Bridge (7.6 km south-east), Heswall (9.8 km north-east) and Hawarden (9.8 km south-east). 5 stations lie within 10 km in all. Of the five, Hawarden is the most punctual at 78.5% and Hawarden Bridge the least at 73.6%, with Flint on 74.4%.
Flint takes its name from a town called Flint, home to about 13,736 people, and the station stands 0.6 km from its centre.
2 operators call at Flint: Transport for Wales (75.5%, 85% of stops) and Avanti (67.5%, 15% of stops). The operator you travel with matters: Transport for Wales reaches 75.5% within three minutes while Avanti manages 67.5%, a gap of 8.0 percentage points.
2 of 3 stations of a similar size in Wales are more punctual than Flint on 74.4%. The comparison group includes Prestatyn (75.2%), Colwyn Bay (79.8%) and Severn Tunnel Junction (73.3%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Transport for Wales | 25,866 | 75.5% | 2.0% |
| Avanti | 4,407 | 67.5% | 2.9% |
Operators with their own page for this station are linked to it.
Late train at Flint? Delay Repay
These operators call at Flint and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 2,740 | 76.8% | 1.4% |
| Period 6 of 2026-27 | 2,754 | 66.7% | 2.7% |
| Period 5 of 2026-27 | 2,651 | 69.8% | 2.6% |
| Period 4 of 2026-27 | 2,680 | 71.6% | 2.6% |
| Period 3 of 2026-27 | 2,507 | 72.3% | 2.8% |
| Period 2 of 2026-27 | 2,395 | 70.5% | 2.1% |
| Period 1 of 2026-27 | 2,360 | 80.3% | 1.8% |
| Period 13 of 2025-26 | 2,246 | 82.1% | 1.6% |
| Period 12 of 2025-26 | 2,050 | 81.7% | 1.2% |
| Period 11 of 2025-26 | 1,997 | 82.8% | 2.6% |
| Period 10 of 2025-26 | 1,863 | 78.8% | 1.9% |
| Period 9 of 2025-26 | 2,031 | 67.1% | 2.0% |
| Period 8 of 2025-26 | 1,999 | 70.4% | 1.7% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Wales
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Prestatyn | 30,643 | 75.2% | 2.1% |
| Colwyn Bay | 30,645 | 79.8% | 2.2% |
| Severn Tunnel Junction | 29,878 | 73.3% | 4.4% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out