Haywards Heath
HHESouth EastManaged by Govia Thameslink Railway (Southern)
How this station is performing
Haywards Heath had 120,845 scheduled stops to Period 7 of 2026-27, about 332 a day. 71.4% of recorded arrivals were within three minutes of the timetable and 5.8% of scheduled stops were cancelled.
Haywards Heath opened on 12 July 1841, 185 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Haywards Heath is the oldest; the next oldest, Burgess Hill, dates from 1841.
The nearest stations to Haywards Heath are Wivelsfield (4.6 km south), Burgess Hill (5.9 km south), Balcombe (6.1 km north), Plumpton (9.1 km south) and Hassocks (9.4 km south). 5 stations lie within 10 km in all. Of the five, Balcombe is the most punctual at 76.6% and Plumpton the least at 67.8%, with Haywards Heath on 71.4%.
Haywards Heath takes its name from a town called Haywards Heath, home to about 30,826 people, and the station stands 0.5 km from its centre.
For Haywards Heath, the weakest four-week period in the data is a recent one: Period 6 of 2026-27, when only 50.0% of stops arrived within three minutes of the timetable. The strongest was Period 13 of 2025-26, at 82.5%, which is 32.5 percentage points higher.
Compared with 3 stations of a similar size in South East, Haywards Heath is the least punctual, at 71.4%. All of them are ahead, including Barnham (81.6%), Redhill (78.3%) and Sevenoaks (76.3%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| GTR | 120,845 | 71.4% | 5.8% |
Operators with their own page for this station are linked to it.
Late train at Haywards Heath? Delay Repay
These operators call at Haywards Heath and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 8,727 | 64.6% | 4.8% |
| Period 6 of 2026-27 | 8,914 | 50.0% | 7.8% |
| Period 5 of 2026-27 | 8,775 | 65.1% | 7.7% |
| Period 4 of 2026-27 | 9,434 | 71.0% | 8.1% |
| Period 3 of 2026-27 | 9,095 | 72.3% | 5.8% |
| Period 2 of 2026-27 | 9,384 | 77.8% | 6.2% |
| Period 1 of 2026-27 | 10,978 | 81.1% | 4.0% |
| Period 13 of 2025-26 | 9,905 | 82.5% | 3.5% |
| Period 12 of 2025-26 | 9,330 | 74.8% | 4.8% |
| Period 11 of 2025-26 | 8,670 | 73.7% | 3.2% |
| Period 10 of 2025-26 | 8,677 | 74.8% | 4.3% |
| Period 9 of 2025-26 | 9,365 | 64.0% | 7.6% |
| Period 8 of 2025-26 | 9,591 | 71.1% | 8.1% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South East
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out