GTR at Redhill
How this operator is doing here
GTR had 93,934 scheduled stops at Redhill in the 13 periods to Period 7 of 2026-27, 79% of the station's total. 78.6% of recorded arrivals came within three minutes and 5.4% of stops were cancelled.
GTR trains at Redhill also serve Earlswood (Surrey) (1.4 km south, 76.2% on time, 8.5% cancelled), Reigate (2.6 km west, 86.5% on time, 5.2% cancelled), Nutfield (2.7 km south-east, 82.5% on time, 1.5% cancelled), Merstham (2.9 km north-east, 80.8% on time, 5.1% cancelled), Salfords (Surrey) (4.3 km south, 77.4% on time, 8.5% cancelled) and Kingswood (6.9 km north-west, 84.4% on time, 2.9% cancelled), which are the stations on its network closest to Redhill.
Within 30 km of here, GTR runs best at Birkbeck, 19.7 km north-east (98.1%), and worst at Kenley, 10.4 km north-east (66.9%).
The busiest GTR station within 30 km of Redhill is East Croydon, 15.9 km north, with about 813 scheduled stops a day.
Of the 2 operators with enough records at Redhill, GTR is the most punctual, at 78.6%.
GTR at Redhill has slipped a little, from 82.0% within three minutes in the previous 13 periods to 78.6% in the latest 13, a fall of 3.4 percentage points. Cancellations fell to 5.4% of scheduled stops from 6.3%, which is 0.9 percentage points fewer.
Period by period
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 7,384 | 69.4% | 5.0% |
| Period 6 of 2026-27 | 7,130 | 65.1% | 6.0% |
| Period 5 of 2026-27 | 7,185 | 72.5% | 7.5% |
| Period 4 of 2026-27 | 7,342 | 78.3% | 7.9% |
| Period 3 of 2026-27 | 6,630 | 77.8% | 4.4% |
| Period 2 of 2026-27 | 7,184 | 85.3% | 4.1% |
| Period 1 of 2026-27 | 8,438 | 86.9% | 3.4% |
| Period 13 of 2025-26 | 7,949 | 86.9% | 2.6% |
| Period 12 of 2025-26 | 7,421 | 81.4% | 5.1% |
| Period 11 of 2025-26 | 6,191 | 78.3% | 4.6% |
| Period 10 of 2025-26 | 6,274 | 81.4% | 6.1% |
| Period 9 of 2025-26 | 7,426 | 75.2% | 9.1% |
| Period 8 of 2025-26 | 7,380 | 80.9% | 5.0% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Redhill
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Great Western Railway | 24,777 | 76.9% | 8.0% |
| Southeastern | 4 | – | – |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out